Application Details
- Location
- Ardnageeha Cullen
- Applicant
- N/A
- Application Type
- OUTLINE PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 20 October 2004
- Status
- WITHDRAWN
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Retention of sunroom extension to the side of the existing dwellinghouse on site with revised boundaries
Knockagarrane East Cullen Mallow Co. Cork
Retention of relocation of entrance, and Permission for construction of a detached domestic garage, ground floor extension to side and porch extension to front, and alterations to side of dwelling with related site works
Knockagarrane East Cullen Mallow Co.Cork
Construction of easy feed slatted house with cubicles and slatted tank
Knockagarrane West Cullen Mallow
Construction of slatted unit (underground tank) with agricultural shed
Knocknageeha South Cullen Mallow
Construction of slatted unit (underground unit) with agricultural shed
Knocknageeeha South Cullen Mallow
Construction of slatted unit (underground tank) with agricultural shed
Knocknageeha South Cullen Mallow
Retention of the following (a) ground floor extensions and first floor extension to existing single storey dwelling. (b) detached domestic garage/store, and well pump/boiler house. (c)Two number vehicular entrances to dwelling.
Knockagarrane West Cullen Mallow Co. Cork
Retention of as constructed dwellinghouse and domestic garage (original Permission granted under Planning Reg. No. 08/7222) and Permission to complete the dwellinghouse and the domestic garage and minor alterations to the site boundaries and the installation of a septic tank and percolation area
Derragh Cullen Mallow Co. Cork
Retention of domestic garage as constructed to western side of existing two storey dwelling
Knockane Cullen
Retain domestic garage as constructed to western side of existing two storey dwelling
Knockane Cullen
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?