← Back to search

Nos. 3,4,9,10,16,17, 27,28,34,35,36 & 37 Parkmountain Youghal

CONDITIONAL

Planning application 05/4048

Cork - Cork County Council

Proposed Development

12 no. dwellinghouses (change of house type and layout)

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 Jun 2005

  2. Decision due

    4 Aug 2005

  3. Decision: CONDITIONAL

    4 Aug 2005

  4. Grant issued

    9 Sept 2005

Application Details

Location
Nos. 3,4,9,10,16,17, 27,28,34,35,36 & 37 Parkmountain Youghal
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
10 June 2005
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
4 August 2005
Grant Date
9 September 2005

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
03/3327CONDITIONAL4 Jul 2003

74 no. dwellinghouses

PARKMOUNTAIN, PARKMOUNTAIN,

0m
05/3518INCOMPLETED APPLICATION23 May 2005

Modifications to previously permitted 03/3327 to include change of house plan from 2 bed to 3 bed dwellinghouses at nos. 3, 4, 9, 10, 16, 17, 28, 34, 35 and 36

Parkmountain Youghal

54m
05/6352CONDITIONAL2 Sept 2005

12 no. dwellinghouses (change of house type) at Nos. 42, 43, 46, 47, 50-53, 55, 56, 59 and 60

Parkmountain Youghal

73m
05/9023CONDITIONAL6 Dec 2005

Installation of 3 no. underground natural gas storage tanks and associated site works

Gleann Tuarigh Parkmountain Youghal

94m
08/4295CONDITIONAL23 Jan 2008

Construction of 2 no. semi-detached dwellinghouses

Adjacent to No.5 Gleann Tuarigh Parkmountain Youghal

94m
07/13308INCOMPLETED APPLICATION21 Dec 2007

2 no. semi-detached dwellinghouses

Site adjacent to 5 Gleann Tuarigh Parkmountain Youghal

94m
13/4378UNCONDITIONAL7 Mar 2013

Construction of 2 no. semi-detached dwellinghouses, extension of duration to permission granted under planning Ref. No. 08/4295

Adjacent to.No.5, Gleann Tuarigh Parkmountain Youghal Co. Cork

124m
04/58023CONDITIONAL31 May 2004

CHANGE OF PLAN (REF NO: P 79/99) FOR 4 NO. DWELLINGS NOS. 46-49 INCLUSIVE.

Sweetfield Youghal Co. Cork

130m
18/4041CONDITIONAL11 Jan 2018

Residential development for construction of 66 no. residential units with all ancillary site development works. Development to include the construction of 66 dwellings consisting of 8 no. 3 bedroom semi detached units, 8 no. 4 bedroom semi-detached units, 12 no. 2 bedroom end of terrace units, 9 no. 2 bedroom mid-terrace units, 13 no 3 bedroom end of terraced units, 12 no. 3 bedroom mid-terrace units, 3 no. 4 bedroom end of terrace units, 1 no 4 bedroom mid-terrace unit, construction 3 no. entrances, installation of waste water pumping station, installation of ESB sub-station kiosk, and all associated site development works to include local play areas, open space areas, roadways, footpaths and services with development connection to existing services.

Chickley's Road Sweetfields Youghal Co. Cork

130m
23/5042UNCONDITIONAL23 May 2023

Extension of duration of Residential development for construction of 66 no. residential units with all ancillary site development works. Development to include the construction of 66 dwellings consisting of 8 no. 3 bedroom semi-detached units, 8 no. 4 bedroom semi-detached units, 12 no. 2 bedroom end of terrace units, 9 no. 2 bedroom mid-terrace units, 13 no 3 bedroom end of terraced units, 12 no. 3 bedroom mid-terrace units, 3 no. 4 bedroom end of terrace units, 1 no 4 bedroom mid-terrace unit, construction 3 no. entrances, installation of waste water pumping station, installation of ESB sub-station kiosk, and all associated site development works to include local play areas, open space areas, roadways, footpaths and services with development connection to existing services. Granted under Planning Reference Number 18/4041.

Chickley's Road Sweetfield Youghal Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?