← Back to search

Rossmore Carrigtwohill

INCOMPLETED APPLICATION

Planning application 05/4722

Cork - Cork County Council

Proposed Development

Agricultural building for storing farm machinery and new entrance

View the full application file on the council's planning portal →

Application Details

Location
Rossmore Carrigtwohill
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
4 July 2005Other applications received that week
Status
INCOMPLETED APPLICATION
Decision
Pending

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

149m
03/4041CONDITIONAL13 Aug 2003

Dwelling

ROSSMORE, ROSSMORE,

560m
05/3032CONDITIONAL6 May 2005

Domestic workshop with attic space to rear of existing dwellinghouse

Rossmore Carrigtwohill

561m
09/7675INCOMPLETED APPLICATION18 Nov 2009

Retention of alterations to extension to dwelling

Rossmore Carrigtwohill

690m
18/6874CONDITIONAL31 Oct 2018

The development consists of the continued use of the existing asphalt plant, the existing storage shed (837 sq. metres), and associated infrastructure and structures permitted under P. Ref. S/02/5476 (ABP Ref. PL04.203762); P. Ref. 14/04061; and P. Ref. 14/06489 (ABP Ref. PL04.244651) within an application area of 1.605 Hectares.

Rossmore Carrigtwohill Co. Cork

691m
21/5511INCOMPLETED APPLICATION31 May 2021

An increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under Planning Reg. Nos. 18/06874, 19/5050 and 20/04589), from 100 no. days per annum to 150 no. days per annum, within an application area of 1.605 Hectares. The proposed development will not result in any change in current output rates.

Rossmore Carrigtwohill Co. Cork

691m
20/4589CONDITIONAL20 Mar 2020

The development will consist of an increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under planning reg. ref’s 18/06874 and 19/5050), from 60 no. days per annum to 100 no. days per annum, within an application area of 1.605 hectares. The proposed development will not result in any change in current output rates.

Rossmore Carrigtwohill Co. Cork

693m
14/6489CONDITIONAL20 Nov 2014

The application site comprises an existing asphalt plant (permitted as part of overall quarry development under Cork County Council Planning Ref. No. 02/5476, and An Bórd Pleanála Ref. No. PL04.203762) The proposed development seeks to provide for the extension of opening hours of asphalt plant to allow operations on site between 0600 hours and 1900 hours Mondays to Fridays and between 0700 hours and 1600 hours on Saturdays; occasional operations outside of normal working hours up to a maximum of 40no. days per annum. The proposed development will not result in any increase in the permitted output rate of existing quarry, which will be maintained at a rate of 250000 tonnes per annum

Rossmore Carrigtwohill Co.Cork

710m
08/10142CONDITIONAL16 Dec 2008

Sunroom extension to rear of dwelling, domestic garage, removal of existing septic tank & installation of proprietary treatment system

Ballintubbrid West Carrigtwohill

748m
16/6545CONDITIONAL13 Oct 2016

Resurfacing of existing silage slab, material change of use of straw storage shed to dairy, pump house & loose house and material change of use of existing animal house to milking parlour, holding yard, drafting area & loose house complete with all associated works

Barryscourt Carrigtwohill Co. Cork

851m
09/7460CONDITIONAL27 Oct 2009

Change of house & garage design from that granted under planning ref.no. 06/13903 & installation of septic tank, percolation area, new site entrance & associated site works

Ballintubbrid West Carrigtwohill

The submission window has closed

Observations on this application closed on Sunday 7 August 2005, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?