← Back to search

Ballyellis Mallow

INCOMPLETED APPLICATION

Planning application 05/4947

Cork - Cork County Council

Application Details

Location
Ballyellis Mallow
Applicant
N/A
Application Type
OUTLINE PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
12 July 2005Other applications received that week
Status
INCOMPLETED APPLICATION
Decision
Pending

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

40m
06/9724CONDITIONAL14 Aug 2006

Dwellinghouse

Ballyellis Mallow

40m
17/4964CONDITIONAL21 Apr 2017

Construction of a dwelling house and all associated site works.

Ballyellis Mallow Co. Cork

40m
23/4609CONDITIONAL31 Mar 2023

Construction of a dwelling and all associated site works.

Ballyellis Mallow Co Cork

253m
05/55003Awaiting F.I. Response18 Jan 2005

Construction of 27 dwellings consisting of 5x4 bed detached and 22x3 bed semi-detached units and associated site works, adjacent to permitted development P.D. 2260/PL 70.128878 currently under construction

Collegewood, Ballyellis Mallow Co. Cork.

342m
03/3547CONDITIONAL17 Jul 2003

Dwellinghouse and sewage treatment system

BALLYELLIS, BALLYELLIS,

342m
06/11126CONDITIONAL3 Oct 2006

Retention and completion of entrance and retention of installation of 3 no. roof lights to rear of dwelling

Cuan Dor Ballyellis Mallow

351m
12/55024CONDITIONAL28 Dec 2012

Permission to construct a new dwelling house

Bearforest lower Mallow Co. Cork.

399m
07/55086CONDITIONAL26 Nov 2007

Permission to retain (1) sun room on the southern gable (2) porch on the front elevation (3) en-suite on the first floor (4) relocation of chimney in living room

Elgannook Bearforest Lower Mallow Co. Cork.

487m
25/6943Grant with Conditions22 Dec 2025

The proposed development includes for the upgrade of the existing Mallow WTP to bring it into compliance with Uisce Éireann technical guidance documents with regards the coagulation, flocculation & clarification (CFC), filtration, chemical storage & dosing and residuals treatment processes. In addition, as part of the upgrade works it is proposed to increase the capacity of the WTP from 4,754m3/day to 5,042m3/ 22 hours. The development will consist/consists of the following: • Upgrade of the existing CFC process, including for the following: o Construction of a new flash mixing chamber with vertical turbine paddle; o Construction of a 3 no. cell flocculation stage and mixing process (Note: The provision of the new flash mixing and flocculation tank will require the relocation of existing outdoor chemical bulk storage tanks, the demolition of an existing storage building adjacent the main WTP building and the relocation of existing overhead lines.) • Pipework modifications to the existing rapid gravity filters. • Upgrade of the existing washwater residuals and sludge handling processes to ensure adequate treatment of residuals prior to river discharge and adequate storage for sludge on site, including: o 1no. new below ground equalization tank o 1no. new above ground settlement tank to be installed. o Re-purpose the existing sludge holding tank as a sludge balance tank. o 1no. picket fence thickener. o 1no. new sludge holding tank. o 2 no. pumping station kiosks, including: -sludge pumping station -sludge holding tank feed pumping station • Upgrade of the existing chemical storage arrangements including: o Installation of 1 no. outdoor Fluoride Bulk storage tank with integrated weather shrouded bund o Installation of 2 no. outdoor Poly Aluminium Chloride bulk storage tanks with integrated weather shrouded bunds o Installation of 2 no. outdoor Sodium Hydroxide bulk storage tanks with integrated weather shrouded bunds o Installation of 1no. outdoor Sodium Hypochlorite bulk storage tank. o Installation of 2 no. dedicated chemical delivery apron upon which chemical delivery vehicles shall park while unloading chemicals to the bulk storage tanks. The surface water network for the chemical delivery apron shall be able to be isolated during chemical deliveries and redirected towards a dedicated underground containment tank to capture any chemical spills. o Installation of 1no. indoor Orthophosphate bulk storage tank and bund. (Note, the existing chemical building to be modified including for replacement of 2 no. windows with a single and double door respectively). • Upgrade of the road layout to facilitate the proposed infrastructure upgrade for delivery of chemicals and sludge removal off-site. • Upgrade the surface water management for the proposed works, ensuring that the design complies with the requirements for sustainable drainage system (SuDS). • All ancillary site works including upgrade of the existing electrical, instrumentation, control & automation of the plant, diversion of existing overhead power lines and tree and hedgerow removal.

Mallow Water Treatment Plant, Ballyellis, Mallow, Co. Cork, P51 P489

489m
20/6524CONDITIONAL16 Nov 2020

The construction of a new treated water storage tank comprising 1 no. 33.9m diameter single-celled precast underground concrete tank; ancillary structures comprising of 1 no. underground concrete scour chamber, 1 no. de-chlorination system and associated above-ground kiosk, and 1 no. above ground telemetry kiosk; and other ancillary development including associated underground pipework and cabling, extension to existing hard-surfaced internal circulation area, landscaping and all associated site development works.

Ballyellis Water Treatment Plant Ballyellis Mallow Co. Cork

The submission window has closed

Observations on this application closed on Monday 15 August 2005, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?