← Back to search

Curragrine Castlemartyr

CONDITIONAL

Planning application 05/495

Cork - Cork County Council

Application Timeline

  1. Application received

    2 Feb 2005

  2. Decision due

    29 Mar 2005

  3. Decision: CONDITIONAL

    29 Mar 2005

  4. Grant issued

    4 May 2005

Application Details

Location
Curragrine Castlemartyr
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
2 February 2005
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
29 March 2005
Grant Date
4 May 2005

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
16/6979INCOMPLETED APPLICATION30 Nov 2016

1. Construction of the following Buildings or structures and associated services and site works:- • Cheese Production Building – predominantly single-storey with 3-storey middle section and 2-storey administration block • Single storey part Open sided, roofed, Milk Intake Unit and piperack structure • Single storey Workshop • Single storey Box Store • 2-storey Reception and Staff Facilities Building • Single storey Boiler House • Single storey RO and Pasteurisation Building • Single storey Weighbridge Security Building • Single storey Water Treatment and Fire Pumphouse Building • Electrical Sub-station and Switchroom • 2-bay Loading Bay structure attached to the northern end of the existing cheese factory • 2 No. water storage tanks (12.6m and 9.6m high); 1 No. Salt Saturation Storage Tank (5.1m high) 2. Closure of 3 entrances and the construction of new entrance for HGV traffic off the L3627 on the northern site boundary. Closure of the existing HGV entrance and construction of new entrance for staff and visitor car traffic only off the L3805 Mogeely-Castlemartyr Road on the eastern site boundary 3. Demolition of the following Buildings or Structures and associated services: a) Dairy and Maintenance Workshop Building; b) Packaging Store; c) Boiler House and 3 No. stacks (33.9m high); d) Canteen; e) Reception and Office Building; f) Generator Building and removal of all associated Redundant Tankage. 4. Upgrade of an existing bund and construction of new adjoining bund to accommodate existing tanks and the following new tankage, (height listed in brackets) and all services associated with the tankage: 6 No. Milk Silos(14.0m), 2 No. Milk Silos(18.5m), 3 No. Cream Storage Tanks(5.8m), 5 No. Cleaning Tanks(8.0m),4 No. Cleaning Tanks(5.0m), 2 No. Whey Silos(12.7m), 2 No. Whey Silos(13.2m), 2 No. Bulk Chemical Tanks(5.45m) 5. Construction of a 124 space Car Park, Internal Roads accessing the site from the new Entrances / Exits, Covered Pedestrian Walkway and mounded Berms, Boundary Walls, Fencing and all Associated Landscaping Works. 6. Upgrade and expansion of the existing Wastewater Treatment Plant including new Balance Tank, Anaerobic and Aerobic Tanks, Clarifier, Picket Fence Thickener, Dissolved Air Flotation (DAF) Plant, Pumping Station, Control Room, Filters and Concrete Plinths. The proposed upgrade will include the demolition of the existing works including the existing 9.5m high Biotower. 7. Installation of an underground Pipeline

Mogeely Killamucky Co. Cork

1m
16/7031CONDITIONAL8 Dec 2016

To construct new cheese production facility and a significant upgrade of the existing Dairygold Food Ingredients (DFI) facility. The proposed development consists of: 1. Construction of the following Buildings or structures and associated services and site works:- • Cheese Production Building – predominantly single-storey with 3-storey middle section and 2-storey administration block • Single storey part Open sided, roofed, Milk Intake Unit and piperack structure • Single storey Workshop • Single storey Box Store • 2-storey Reception and Staff Facilities Building • Single storey Boiler House • Single storey RO and Pasteurisation Building • Single storey Weighbridge Security Building • Single storey Water Treatment and Fire Pumphouse Building • Electrical Sub-station and Switchroom • 2-bay Loading Bay structure attached to the northern end of the existing cheese factory • 2 No. water storage tanks (12.6m and 9.6m high); 1 No. Salt Saturation Storage Tank (5.1m high) 2. Closure of 3 entrances and the construction of new entrance for HGV traffic off the L3627 on the northern site boundary. Closure of the existing HGV entrance and construction of new entrance for staff and visitor car traffic only off the L3805 Mogeely-Castlemartyr Road on the eastern site boundary 3. Demolition of the following Buildings or Structures and associated services: a) Dairy and Maintenance Workshop Building; b) Packaging Store; c) Boiler House and 3 No. stacks (33.9m high); d) Canteen; e) Reception and Office Building; f) Generator Building and removal of all associated Redundant Tankage. 4. Upgrade of an existing bund and construction of new adjoining bund to accommodate existing tanks and the following new tankage, (height listed in brackets) and all services associated with the tankage: 6 No. Milk Silos(14.0m), 2 No. Milk Silos(18.5m), 3 No. Cream Storage Tanks(5.8m), 5 No. Cleaning Tanks(8.0m),4 No. Cleaning Tanks(5.0m), 2 No. Whey Silos(12.7m), 2 No. Whey Silos(13.2m), 2 No. Bulk Chemical Tanks(5.45m) 5. Construction of a 124 space Car Park, Internal Roads accessing the site from the new Entrances / Exits, Covered Pedestrian Walkway and mounded Berms, Boundary Walls, Fencing and all Associated Landscaping Works. 6. Upgrade and expansion of the existing Wastewater Treatment Plant including new Balance Tank, Anaerobic and Aerobic Tanks, Clarifier, Picket Fence Thickener, Dissolved Air Flotation (DAF) Plant, Pumping Station, Control Room, Filters and Concrete Plinths. The propo

Mogeely and Killamucky Mogeely Co. Cork

140m
23/5257CONDITIONAL20 Jun 2023

Construct a new single storey rear extension to their existing dwelling house and all associated site works.

Loughaderry Castlemartyr Co. Cork

176m
16/6090UNCONDITIONAL22 Aug 2016

Construction of a storey and a half style dwellinghouse, a detached garage, site entrance, new wastewater treatment system along with all associated site works - Extension of Duration of Permission granted under Planning Reg. No. 11/5579

Loughaderry Castlemartyr Co. Cork

176m
11/5469INCOMPLETED APPLICATION7 Jul 2011

Construction of a storey and a half style dwelling, a detached garage, site entrance and new waste water treatment system along with all other associated site works

Loughaderry Castlemartyr Co Cork

176m
11/5579CONDITIONAL21 Jul 2011

Construction of a storey and a half style dwellinghouse, a detached garage, site entrance, new wastewater treatment system along with all associated site works

Loughaderry Castlemartyr Co. Cork

182m
09/7366CONDITIONAL19 Oct 2009

Extension to existing cottage consisting of a slated pitched roof building not exceeding height of cottage, linked to the existing building by a flat roofed building & a glazed gallery to the south

Loughaderry

182m
07/9856INCOMPLETED APPLICATION25 Jul 2007

Relocation of entrance providing domestic and agricultural access

Loughaderry Castlemartyr

182m
08/4915CONDITIONAL21 Feb 2008

Relocation of entrance providing domestic vehicular access and occasional access for agricultural machinery

Loughaderry Castlemartyr

268m
04/3519CONDITIONAL20 May 2004

Dormer bungalow, garage and sewage treatment facilities

Curragrine Castlemartyr