Proposed Development
extension to the first floor and alterations to the east elevation of the building as granted under Planning P.D. 55,018/04
View the full application file on the council's planning portal →Application Timeline
Application received
11 Nov 2005
Decision: CONDITIONAL
13 Jan 2006
Decision due
14 Jan 2006
Grant issued
21 Feb 2006
Application Details
- Location
- Fair Street Mallow Co. Cork.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 11 November 2005
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 13 January 2006
- Grant Date
- 21 February 2006
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
construction of an ESB sub station, switch room boiler house and water storage tank to service the development granted under P.D. 55,019/04
Fair Street Mallow Co. Cork.
Permission for construction of a new ambulance storage facility with associated accomodation, all with associated access road, landscaping and drainage works
Site adjacent to Mallow Swimming Pool, New Road, Mallow, Co. Cork.
conversion of part of existing building from hostel to 2 no. apartments
Fair Street Mallow Co. Cork.
Permission to construct a two storey extension to rear of existing dwelling and all associated site works
No. 2 Plunkett Terrace Mallow Co. Cork.
the following development consisting of (a) the construction of a 3 storey extension to existing post primary school, connected by new link covered walkway at first floor level. Total proposed development floor area is 2802 sqm, comprising of general classrooms, admin area, and supported education unit plus ancillary staff/student facilities with external student areas, access road, parking and drop off facilities. Development to include PV Panel installation at roof level, Heat Pump enclosure, LPG Tank enclosure. Overall site area is 2.06 Ha (b) removal of existing temporary classroom accommodation along with all related service, and reinstatement of staff car parking on vacated area , removal of temporary parking facilities to ballcourt area, 2 new accessible parking spaces (c) installation of 3 no. flag poles on concrete plinth to front of existing school to plus all associated site works
St. Mary's Secondary School, Mallow, Co. Cork, P51 PY04
Permission for Retention of as built prefabricated building consisting of 5 no. classrooms, 2 no. offices, toilets and circulation space, footpaths and wheelchair ramps and existing temporary car park for a period of five years (permission previously granted for this development under planning reference number 18/5473).
Fair Street Mallow Co. Cork
Permission for retention of as built prefabricated building consisting of 5 no. classrooms, 2 no offices, toilets and circulation space, footpaths and wheelchair ramps and existing temporary car park for a period of five years (permission previously granted for this development under planning reference number 18/5473)
Saint Mary's Secondary School Fair Street Mallow Co.Cork
the following development consisting of (a) the construction of a 3 storey extension to existing post primary school, connected by new link covered walkway at first floor level. Total proposed development floor area is 2802 sqm, comprising of general classrooms, admin area, and supported education unit plus ancillary staff/student facilities with external student areas, access road, parking and drop off facilities. Development to include PV Panel installation at roof level, Heat Pump enclosure, LPG Tank enclosure. Overall site area is 2.06 Ha (b) removal of existing temporary classroom accommodation along with all related service, and reinstatement of staff car parking on vacated area , removal of temporary parking facilities to ballcourt area, 2 new accessible parking spaces (c) installation of 3 no. flag poles on concrete plinth to front of existing school to plus all associated site works
St. Mary's Secondary School, Mallow, Co. Cork, P51 PY04
The construction of new prefabricated school building incorporating 4 general classrooms, office and toilet facilities, connection of foul and surface water sewer systems, relocation of existing car parking to existing tennis court along with all ancillary site works.
Fair Street Mallow Td. Mallow Co. Cork
The construction of prefabricated building consisting of 5 no. classrooms, 2 no. offices, toilets and circulation space, relocation of part of existing carpark together with all other ancillary site works.
Saint Mary's Secondary School Fair Street Mallow Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?