← Back to search

Wallingstown Little Island

REFUSED

Planning application 05/5616

Cork - Cork County Council

Proposed Development

Demolition, excavation and construction of waste(non hazardous) recovery and transfer facility including associated portacabin office, weighbridge, inspection area, processing and stock piling area including mobile machinery for periodic crushing, screening and magnetic separation, wheelwash, quarantine area, entrance, access road, 8 no. car parking spaces, site leveling, landscaping and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Aug 2005

  2. Decision due

    10 Aug 2006

  3. Decision: REFUSED

    10 Aug 2006

Application Details

Location
Wallingstown Little Island
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
5 August 2005
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
10 August 2006

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

13m
07/11699CONDITIONAL16 Oct 2007

Construction of 3 no. light industrial and warehouse buildings comprising of Block A, consisting of 11 no. light industrial or warehouse units each with ancillary office accommodation at ground and first floor level, Block B, consisting of 8 no. light industrial or warehouse units each with ancillary office accommodation at ground and first floor level and Block C, consisting of a single light industrial/warehouse/distribution unit with ancillary office accommodation at ground and first floor level and all site development works to include re-grading of site, realignment of existing access road to adjoining pumping station, provision of ESB substation, 147 no. parking spaces, loading and unloading areas for goods vehicles, boundary fencing and new foul and storm sewers

Wallingstown Little Island

13m
13/4643UNCONDITIONAL11 Apr 2013

Completion of construction of 3 no. light industrial and warehouse buildings comprising of Block A, consisting of 11 no. light industrial or warehouse units each with ancillary office accommodation at ground and first floor level, Block B, consisting of 8 no. light industrial or warehouse units each with ancillary office accommodation at ground and first floor level and Block C, consisting of a single light industrial/warehouse/distribution unit with ancillary office accommodation at ground and first floor level and all site development works to include re-grading of site, realignment of existing access road to adjoining pumping station, provision of ESB substation, 147 no. parking spaces, loading and unloading areas for goods vehicles, boundary fencing and new foul and storm sewers, extension of duration to permission granted under Planning Ref. No. 07/11699

Wallingstown Little Island Co.Cork

14m
14/4271CONDITIONAL13 Feb 2014

Amendments to the industrial/warehouse development permitted under Planning Ref. No. 07/11699, consisting of the making of alterations to the footprint, layout and elevations of the partially constructed block B (Permitted as 8no. light industrial/warehouse units) to provide 1no. industrial/manufacturing unit with ancillary offices, meeting rooms, warehouse/storage, production, research and staff facilities and all associated ancillary development works including car parking, signage and plant/services including a process waste treatment unit annexed to the rear of the building

Wallingstown Little Island Co.Cork

30m
26/0324Invalid - Prepare Letters12 Feb 2026

Construction of a single-storey extension for light industrial use to the south end of existing light industrial building and to retain indefinitely the mezzanine storage area at the north end of the building together with new vehicle access/entrance from existing private roadway to south and associated site works.

Unit D, Island Corporate Park, Wallingstown, Little Island, Co. Cork, T45F673

30m
26/0584F.I. Consultees/Awaiting Recommendation10 Mar 2026

Construction of a single-storey extension for light industrial use to the south end of existing light industrial building and indefinite retention of the mezzanine storage area at the north end of the building and associated site works.

Unit D, Island Corporate Park, Wallingstown, Little Island, Co. Cork, T45F673

35m
21/7231CONDITIONAL30 Nov 2021

Construction of a new single-storey building for the extrusion of aluminium sections including associated office and welfare facilities, parking, outdoor storage, underground services and associated site works at existing manufacturing facility.

Wallingstown Little Island Co. Cork

70m
07/8378REFUSED5 Jun 2007

Construction of light industrial/warehousing/distribution unit with ancillary offices, access road and ancillary site works and services

Wallingstown Little Island

133m
07/12828CONDITIONAL3 Dec 2007

Construction of light industrial/warehouse building with ancillary office accommodation and associated site works to include boundary fence, car parking, service yard and feature signage

Wallingstown Little Island

134m
12/6610INCOMPLETED APPLICATION21 Dec 2012

Construction of a new industrial unit to accommodate a waste management and environmental services facility comprising of 1) new warehouse and two-storey office unit with ancillary accommodation to serve same, 2)1no. new site entrance and modifications to 1no. existing site entrance, 3) new tank farm consisting of 6no. bunded 30,000 litre waste and treated water storage tanks, 4) new semi-enclosed tank wash unit, 5) new weighbridge, 6)Rainwater harvesting unit and all associated site works (change of layout and design from that permitted under planning Reg. No. 08/4093).

Wallingstown Little Island Co.Cork

134m
13/4025CONDITIONAL11 Jan 2013

Construction of new industrial unit to accommodate a waste management and environmental services facility for the acceptance, storage and treatment of non-hazardous waste, comprising of; 1) new warehouse and two-storey office unit with ancillary accommodation to serve same, (2) 1 no. new site entrance and modifications to 1 no. existing site entrance, (3) new tank farm consisting of 6 no. bunded 30,000 litre waste and treated water storage tanks, (4) new semi-enclosed tank wash unit, (5) new weighbridge, (6) new rainwater harvesting unit, (7) new two tonne propane tank and boiler and all associated site works (change of layout and design from that permitted under Planning Register No. 08/4093)

Wallingstown Little Island Co.Cork