← Back to search

Spa Glen Mallow

INCOMPLETED APPLICATION

Planning application 05/6969

Cork - Cork County Council

Proposed Development

2 no. steel masts and retire 230m of overhead conductor

View the full application file on the council's planning portal →

Application Details

Location
Spa Glen Mallow
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
26 September 2005
Status
INCOMPLETED APPLICATION
Decision
Pending

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

36m
26/2170Awaiting Technical Validation19 Aug 2026

Permission for retention for the following; a) alterations to elevations of existing dwelling, b) attached domestic garage to existing dwelling, c) standalone domestic timber shed, d) alterations to ground levels and erection of boundary perimeters, all as constructed on site. Permission is also being sought for widening of existing vehicular entrance and all associated site works

Dromineen, Spa Glen, Mallow, Cork, P51HHN1

78m
25/4689Conditional Permission15 Apr 2025

Permission to demolish the existing attached garage and rear extension, for alteration and extension to the existing dwelling house, alteration of the existing entrance and all associated site works.

'Sun-Villa' Spaglen Mallow Co. Cork.

78m
25/6675Grant with Conditions4 Dec 2025

Permission to demolish the existing attached garage and rear extension and for alteration and extension to the existing dwelling house (change of plan from that permitted under planning reg. 25/4689), alteration of the existing entrance and all associated site works.

Sun-Villa, Spa Glen, Mallow, Co. Cork. P51 NV3P.

82m
03/787REFUSED26 Feb 2003

17 no. dwellinghouses (increase in density on sites 1-6 and proposed development of previous open space)

SPAGLEN RURAL, SPAGLEN RURAL,

93m
06/6575CONDITIONAL24 Apr 2006

Extension to dwellinghouse

The Bride River Valley Spaglen Mallow

105m
03/5770CONDITIONAL19 Nov 2003

Construction of creche with 3 no. apartments over

River Valley Housing Est Spaglen Mallow

105m
03/832REFUSED27 Feb 2003

4 no. retail commercial units

SPAGLEN RURAL, SPAGLEN RURAL,

109m
15/4310CONDITIONAL18 Feb 2015

Construction of two-storey extension onto side of dwelling house

No.14 The Funshion River Valley Spaglen Mallow Co.Cork

112m
10/5373INCOMPLETED APPLICATION2 Jun 2010

2no. dwelling houses & associated site works

Spaglen Mallow

133m
25/6585Grant with Conditions25 Nov 2025

Permission for the retention and completion of 2 no. dwellinghouses (change of plan to part of development permitted under ABP-307414-20) at Nos. 19 and 20 Fairway Avenue, Old Course, Spaglen, Mallow, Co. Cork. The development consists of (a) retention of modifications to floor levels (FFLs) as constructed, and (b) permission for the completion of two dwelling houses and all associated site development works. The dwellings were previously identified as house no.s 113 and 114 under ABP-307414-20.

19 & 20, Fairway Avenue, The Old Course, Spaglen, Mallow, Co. Cork

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?