Proposed Development
Two storey dormer building comprising of 8 no. two storey bedroom apartments at ground floor level and 8 no. three bedroom apartments at first and second floor levels with car park, site entrance and associated site works
Application Timeline
Application received
7 Oct 2005
Decision: CONDITIONAL
14 Jun 2006
Decision due
15 Jun 2006
Grant issued
20 Jul 2006
Application Details
- Location
- Newtown Ringmeen Rural Cobh
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 7 October 2005
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 14 June 2006
- Grant Date
- 20 July 2006
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The construction of 21 no. apartments in 5 no. three-storey buildings (block A,B,C,E & G); 6 no. apartments in 1 no. three/four storey building (block F); and 3 no. two-storey townhouses (block D), together with all associated services and site development works.
Newtown Ringmeen Cobh Co. Cork
Permission for the construction of 2 no. refuse bin enclosures, together with all associated site development works to permitted residential development (Pl.Reg.No. 20/5135).
Newtown Ringmeen Cobh Co Cork
The retention application will consist of the following: 1) Retention of a single storey playroom extension (8.5M2) to the rear of the dwelling.
26 Beachwood Mews Cluain Ard Ringmeen Cobh, Co. Cork
Retention to erect 291 m2 of photovoltaic panels on the roof of existing shop with all associated site works at Triode Newhill Management Services Limited T/A EUROSPAR Cobh.
EUROSPAR Cobh Newtown Rd Ballyvoloon Cobh, Co. Cork
Permission for retention to erect 291 m2 of photovoltaic panels on the roof of the existing shop with all associated site works.
Eurospar Cobh Newtown Rd, Ringmeen Ballyvoloon Cobh, Co. Cork
Retention to erect 291 m2 of photovoltaic panels on the roof of existing building with all associated site works.
EUROSPAR Cobh Newtown Rd Ballyvoloon Cobh, Co. Cork
Permission for retention to erect 291 m2 of photovoltaic panels on the roof of the existing shop with all associated site works.
Eurospar Cobh Newtown Rd, Ringmeen Ballyvoloon Cobh, Co. Cork
5 no. dwellings and associated site works
Beechwood Mews Newtown Ringmeen Cobh
Erection of 2.0m high metal fence panels and intermediate metal posts together with access gates around lands and all associated site works
Cluain Ard Newtown Road Ringmeen, Cobh Co. Cork
Erection of permanent 2.0m high metal fence panels and intermediate metal posts together with access gates around our lands and all associated site works
Cluain Ard Newtown Road, Ringmeen Cobh Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?