Application Details
- Location
- Smithfield Glantane
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 16 December 2005
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Dwelling
Smithfield Glantane
Dwellinghouse
Smithfield Glantane
Construct a first floor extension over existing single storey dwelling, alterations to existing dwelling, new septic tank system and all associated site works
Smithfield Glantane Mallow
The construction of a first floor extension over existing single storey dwelling, renovations and alterations to existing dwelling, extension to the ground floor and new septic tank system and all associated site works
Smithfield Glantane Co Cork
Construction of first floor extension over existing single storey dwelling, renovations and alterations to existing dwelling, extension to ground floor and new septic tank system and all associated site works
Smithfield Glantane Mallow Co.Cork
Permission for retention of a pedestrian path and permission for the installation of walkway lighting
Smithfield Glantane Mallow co.Cork
The construction of a hurling wall, astro-turf pitch and perimeter fence with all associated site works.
Smithfield Glantane Mallow Co. Cork
The construction of a hurling wall, astro-turf pitch and perimeter fence with all associated site works.
Smithfield Glantane Mallow Co. Cork
[1] Construction of a covered spectator stand, two new dug-outs and an electronic scoreboard and all associated works, [2] floodlighting for the playing field and installation of a generator with associated works, and [3] installation of drainage and levelling of playing field with associated works
Smithfield Glantane Mallow
Permission to construct a dwelling house, vehicular entrance, waste water treatment system and percolation area and all associated site works.
Smithfield Glantane Mallow Co. Cork
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?