Coomacheo Millstreet

CONDITIONAL

Planning application 06/10251

Cork - Cork County Council

Proposed Development

Alterations to 110Kv substation compound to serve permitted windfarm development of 17 no. windturbines to include increase in size of substation compound and alterations to layout, increase in size of control building and installation of septic tank

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    1 Sept 2006

  2. Decision: CONDITIONAL

    19 Oct 2006

  3. Decision due

    26 Oct 2006

  4. Grant issued

    24 Nov 2006

Application Details

Location
Coomacheo Millstreet
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
1 September 2006
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
19 October 2006
Grant Date
24 November 2006

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1.0km
03/6585CONDITIONAL18 Dec 2003

Modifications to windfarm permitted under Reg. No. N/99/0616 to include increase of the turbine height from 44m to 65m

Gneeves Millstreet

1.2km
03/1997CONDITIONAL29 Apr 2003

Windfarm to include 17 no. turbines, 60m meteorological mast,120KV substation, control building, fencing, compound & anc. works

COOMACHEO, COOMACHEO,

1.2km
13/5717CONDITIONAL4 Sept 2013

Ten year planning permission for an extension to existing Gneeves Wind Farm (Planning Refs. 99/0616, 03/6585, 04/1355, 04/0188, 08/5636, 13/4566). The proposed extension will comprise of 3no. turbines (each with a maximum tip height of 91m), a borrow pit, new internal access roads, upgrading of existing internal access roads, underground cables, an extension to the existing substation building with a wastewater holding tank and ancillary works

Gneeves near Millstreet Co.Cork

1.2km
13/5642INCOMPLETED APPLICATION23 Aug 2013

An extension to existing Gneeves Wind Farm (planning refs. 99/0616, 03/6585, 04/1355, 04/188, 08/5636, 13/4566). The proposed extension will comprise of 3 turbines (each with a maximum tip height of 91m), a borrow pit, new internal access roads, upgrading of existing internal access roads, underground cables, an extension to the existing substation building with a wastewater holding tank and ancillary works. An Environmental Impact Statement and Natura Impact Statement accompany this application

Gneeves Near Millstreet Co Cork

1.2km
24/6475Conditional Permission30 Dec 2024

A fifteen (15) year planning permission for continuation of the operational life of the existing Gneeves wind farm from the date of expiration (November 2025) of the current planning permission (N/99/616, 03/6585, 04/188). The site measures 10.101 hectares. The existing wind farm consists of the following; 11 no. existing, operational Vestas V52 wind turbines, 8 no. turbines have a tip height of 91 m and a hub height of 65m, the remaining 3 no. turbines have a tip height of 76.1m and a hub height of 49m. All 11turbines have a rotor diameter of 52m. 1 no. existing operational onsite substation compound, the compound comprises: 38kV electrical substation, a control building, associated electrical plant and equipment, security fencing, associated underground cabling, existing site access tracks and 11 no. turbine hardstandings, existing operational site drainage infrastructure and associated works, including maintenance and improvement works. A Natura Impact Statement (NIS) and Environmental Impact Assessment Report (EIAR) have been prepared in relation to the project and accompany this planning application.

Gneeves Wind Farm Gneeves Near Millstreet Co. Cork

1.3km
24/6238INCOMPLETED APPLICATION26 Nov 2024

A fifteen (15) year planning permission for continuation of the operational life of the existing Gneeves wind farm from the date of expiration (November 2025) of the current planning permission (N/99/616, 03/6585, 04/188). The site measures 10.101 hectares. The existing wind farm consists of the following; 11 no. existing, operational Vestas V52 wind turbines, 8 no. turbines have a tip height of 91 m and a hub height of 65m, the remaining 3 no. turbines have a tip height of 76.1m and a hub height of 49m. All 11turbines have a rotor diameter of 52m. 1 no. existing operational onsite substation compound, the compound comprises: 38kV electrical substation, a control building, associated electrical plant and equipment, security fencing, associated underground cabling, existing site access tracks and 11 no. turbine hardstandings, existing operational site drainage infrastructure and associated works, including maintenance and improvement works. A Natura Impact Statement (NIS) and Environmental Impact Assessment Report (EIAR) have been prepared in relation to the project and accompany this planning application.

Gneeves Millstreet Co.Cork

1.3km
08/5636UNCONDITIONAL25 Mar 2008

Completion of wind farm (13 no. turbines) granted under pl. reg. no. 99/0616 and modified under pl. reg. no. 03/6585

Gneeves Millstreet

1.3km
04/188CONDITIONAL16 Jan 2004

Extension to windfarm permitted under reg. no. N/99/0616 to consist of 4 no. wind turbines (hub height 65m, blade tip 91m), construction of and extension of internal site tracks and associated works

Gneeves Millstreet

1.3km
13/4386INCOMPLETED APPLICATION8 Mar 2013

Completion of windfarm, extension of duration to permission granted under planning Ref. No. N/99/0616, modified under planning Ref. No 03/6585 and which received an extension of duration under planning Ref. No. 08/5636.

Gneeves near Millstreet Co.Cork

1.3km
13/4566UNCONDITIONAL3 Apr 2013

Completion of windfarm (13 no. turbines), extension of duration to permission granted under Planning Reg. No. N/99/0616, modified under Planning Reg. No 03/6585 and which received an extension of duration under Planning Reg. No. 08/5636.

Gneeves Near Millstreet