← Back to search

Glasheenanargid Rockchapel

CONDITIONAL

Planning application 06/10482

Cork - Cork County Council

Proposed Development

Construction of slatted tank and associated concrete works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 Sept 2006

  2. Decision: CONDITIONAL

    12 Feb 2007

  3. Decision due

    13 Feb 2007

  4. Grant issued

    20 Mar 2007

Application Details

Location
Glasheenanargid Rockchapel
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
11 September 2006
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
12 February 2007
Grant Date
20 March 2007

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

34m
26/0679Invalid - Prepare Letters19 Mar 2026

(i) Retention Permission to retain existing slatted tank as constructed (ii) Construct a new shed over aforementioned tank & ancillary external concrete. The above to be carried out with all associated ancillary site works.

Glasheenanargid, Rockchapel, Co. Cork, P51YY6H

34m
26/0988Grant with Conditions18 Apr 2026

(i) Permission for Retention to retain existing slatted tank as constructed (ii) Permission to construct a new shed over the aforementioned tank. Proposed new shed to facilitate a covered collecting/holding yard, cubicles and easy feed. The above to be carried out with all associated ancillary site works.

Glasheenanargid, Rockchapel, Co. Cork

164m
08/7221CONDITIONAL11 Jun 2008

Two storey dwellinghouse and installation of septic tank

Glasheenanargid Rockchapel

176m
08/4330WITHDRAWN24 Jan 2008

Two storey dwellinghouse and installation of septic tank

Glasheenanargid Rockchapel

417m
07/7136CONDITIONAL19 Apr 2007

Construction of slatted shed with underground tank and silage slab

Glasheenanargid Rockchapel

1.0km
04/1787CONDITIONAL18 Mar 2004

Retention of extensions to dwelling

Taurmore Newmarket

1.0km
25/5406Refused15 Jul 2025

Permission for the continued operation of the existing Taurbeg Wind Farm, which includes 11 no. turbines, a 38kV substation and associated infrastructure (as permitted by cork county council ref N/02/3608) for a further period of 10 years from the date of expiry of the current planning permission and for the decommissioning of the entire Taurbeg Wind Farm at the end of that further period. All elements of the wind farm are pre-existing and no modifications are proposed to the existing Taurbeg wind farm as part of this planning application. The Taurbeg wind farm comprises the following elements: 1. 11 no. existing wind turbines with a tip height of 108.2 metres and all associated foundations and hardstanding areas, 2) 1 no. existing onsite 38kV electrical substation including a control building, associated electrical plant and equipment, welfare facilities and a wastewater holding tank, 3) 1no. existing meteorological mast with height of 67m, 4) all existing underground electrical and communications cabling connecting the existing wind turbines to the existing onsite 38kV substation, 5) an existing gated site entrance and existing internal access tracks, 6) existing site drainage, 7) existing ancillary infrastructure, associated site fencing and signage. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in relation to the proposed development and accompany this planning application. The EIAR assess both the continued operation of the Taurbeg wind farm as well as integral elements of the wider project comprising the undertaking of removal of commercial forestry and restoration of farmland habitat at Coom and Knockatee County Kerry, which constitute offsetting measures associated with the continued operation of the Taurbeg Wind Farm. These offsetting measures are located in a separate planning authority jurisdiction (Kerry County Council) and will be subject of a separate planning application to the planning authority.

Glasheenanargid Taurbeg and Taurmore Co.Cork

1.0km
16/6195INCOMPLETED APPLICATION1 Sept 2016

A Ten Year Permission for development of this site. To extend the permitted operational lifetime of the Taurbeg wind farm for a period of 5 no. years (2026-2031), from 20 to 25 years which was consented under Planning Reg. 02/3608. Activities which will be carried out within that period will also include the clear felling of approx. 0.15ha of existing conifer plantation and the replanting of same. An Environmental Impact Statement (EIS) and Natura Impact Statement (NIS) will be submitted with the planning application.

Taurbeg, Taurmore and Glasheenanargid Rockchapel Co. Cork

1.0km
16/6366REFUSED26 Sept 2016

To amend Condition No. 7 of windfarm development permitted under planning Reg No. 02/3608 which specified that ‘the structures shall be removed at the expiration of a period of 20 years beginning on the date of commissioning of the development to allow for a period of 25 years from the date of commissioning instead of 20 years specified in the condition and extend the permitted operational lifetime of the Taurbeg Windfarm for a period of 5 years (2026-2031) and Permission for the clear felling of approximately 0.15ha of existing conifer plantation and the replanting of same

Taurbeg Taurmore, Glasheenanargrid Rockchapel Co. Cork

1.3km
07/11946CONDITIONAL26 Oct 2007

Retention of underground effluent tank

Foiladaun Rockchapel

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?