Proposed Development
Construct a purpose built children daycare centre with proprietary secondary waste water treatment system
Application Timeline
Application received
6 Jun 2006
Decision due
6 Nov 2006
Decision: CONDITIONAL
6 Nov 2006
Grant issued
14 Dec 2006
Application Details
- Location
- Cametringane Castletownbere
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 6 June 2006Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 6 November 2006
- Grant Date
- 14 December 2006
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of end-of-terrace single storey dwelling
CAME POINT, CAME POINT, CAMETRINGANE,
Construction of single storey dwelling
CAME POINT, CAME POINT, CAMETRINGANE,
(i) Demolition of existing plant room building, (ii) Removal of existing storage container, (iii) Construction of new single storey plant room/storage building and retaining wall, (iv) Installation of 21no. individual camping pods each consisting of a timber pod structure with single bedroom and shower room and (v) All associated site works required for the pods including installation of access paths and service connections
Cametringane Castletownbere Co. Cork
Demolition of existing 2 storey structure and link to main building and all associated works at licensed premises
Beara Coast Hotel Cametringane Castletownbere Co. Cork
The proposed development consists of a small craft harbour, which will provide mooring capacity to 32 inshore fishing vessels with a maximum size of 18m length overall (LOA), for all tidal conditions. The Small Craft Harbour will consist of a main walkway and multiple finger pontoons and will be connected to the land via a gangway. Safety light and service pedestal will be installed on the Small Craft Harbour
Dinish Island Castletownbere Co. Cork
The removal of an existing rock outcrop to form a stone hard standing area including associated site works. Rock romoved is to be temporarily stored within property of DAFM on Dinish Island prior to reuse within 18 months. The proposed site is situated towards the western end of Dinish Island within the property of Castletownbere Fishery Harbour Centre.
Castletownbere Fishery Harbour Centre, Dinish Island, Castletownbere, Co. Cork
Construction of extensions to existing production facility
Dinish Island Castletownbere Beara
Construction of extensions to existing production facility
Dinish Island Castletownbere
Retention of construction of detached Compressor House and of alterations to elevations of Calcareous Marine Algae facility and Permission for additions to same to include (a) lean-to canopy to east, (b) lean-to pallet store to north and (c) loading dock to south
Dinish Island Castletownbere Beara Co Cork
Construction of additional warehouse for extension to existing Calcareous Marine Algae facility to provide additional ground floor product storage and ancillary site works and alterations to roof line of existing production building
Dinish Island Castletownbere Co Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?