Proposed Development
Replacement of 3 no. solvent towers, construction of tanker unloading facility and control room extension to plant
View the full application file on the council's planning portal →Application Timeline
Application received
5 Dec 2006
Decision: CONDITIONAL
5 Feb 2007
Decision due
7 Feb 2007
Grant issued
13 Mar 2007
Application Details
- Location
- Ballintaggart Ringaskiddy
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 5 December 2006
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 5 February 2007
- Grant Date
- 13 March 2007
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Replacement of solvent towers and extension to tanker unloading facility and control room
API Plant Ballintaggart Ringaskiddy
Construction of a small scale production unit comprising of an extension and redevelopment of existing ancillary production building 194 Cell 2 and west access stairs including construction of an additional stairs block and penthouse on the roof of the existing building.
Ballintaggart Ballybricken Ringaskiddy Co.Cork
Demolition of workshop and stores, OSP2 drum store and organic synthesis production no. 2 (OSP2 Production Building) excluding integrated sub-station.
Ballintaggart and Ballybricken Ringaskiddy
Construction of extension at ground, first, second and penthouse floor levels of the existing organic synthesis production building No.1 and an ancillary single storey shed to accommodate cylinder storage
Ballintaggart Ballybricken Ringaskiddy Co.Cork
Construction of 2 no. storage sheds adjacent to the existing Organic Synthesis Plant 4 Finished Goods Building at their production facility. The proposed development is covered by an existing Industrial Emissions Directive Licence No. P0013-04. The development refers to a modification to an establishment to which the Major Accident directive applies.
Ballintaggart and Ballybricken Townlands Ringaskiddy Co Cork
Construction of a two-storey extension at ground floor level to an existing Laboratory building at their production facility at Ballintaggart and Ballybricken townlands. The proposed extension will consist of a hydrogenation room, an electrical room, a fumehood laboratory, laboratory technology space and an associated external covered canopy with a combined floor area of 207m².
Ballintaggart and Ballybricken Townlands Ringaskiddy Co. Cork
The construction of a one storey extension above the existing stairs, access corridor, lift and escape stairs to serve the plant room floor level of the extension granted under Planning Reg. No. 16/4784 to raise the height of this extension to the existing Organic Synthesis Production Building No. 1. The proposed development is covered by an existing Industrial Emissions Licence No. P0013-04. The development refers to a modification to an establishment to which the Major Accident directive applies.
Ballintaggart and Ballybricken Ringaskiddy Co. Cork
Construct a ground floor extension to the existing Organic Synthesis Production Building No.1 and an extension at ground, mezzanine, first, second and penthouse floor levels to the existing Organic Synthesis Production Building No.3. The proposed development is covered by an existing Integrated Pollution Prevention and Control License No. P0013-14. The development refers to modification to an establishment to which the Major Accident directive applies.
Ballintaggart & Ballybricken Ringaskiddy Co. Cork
The construction of an extension at ground, first, second, third and plant room floor levels to the existing Organic Synthesis Production Building No. 1. The proposed development is covered by an existing Industrial Emissions Licence No. P0013-04. The development refers to a modification to an establishment to which the Major Accident directive applies.
Ballintaggart & Ballybricken Ringaskiddy Co. Cork
Construction of extension to the northern elevation and a new personnel door to the southern elevation of the existing sub-station and associated site works
Ballintaggart Ballybricken Ringaskiddy
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?