Proposed Development
Erection of 38kV steel mast
Application Timeline
Application received
31 Jan 2006
Decision due
27 Mar 2006
Decision: CONDITIONAL
27 Mar 2006
Grant issued
2 May 2006
Application Details
- Location
- Ballyviniter Lower Mallow
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 31 January 2006Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 27 March 2006
- Grant Date
- 2 May 2006
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The construction of 18 no. dwellings houses consisting of 14 no. Type G, 3 bedroom semi detached dwellings, 4 no. Type C, 3 bedroom semi detached dwellings and ancillary site works. The proposed development is a change of plan and change of house type from that permitted under planning reference no. ABP-301429-18.
Hazel Hill Hazel Brooke Spaglen Mallow, Co. Cork
Domestic garage, play room and utility shed
Ballyviniter Lower Mallow
Demolition of dwelling and construction of bungalow
Ballyviniter Lower Mallow
Installation of a 0.50m x 0.87m x 1.62m (LxWxH) above ground enclosure, to house a new natural gas District Regulating Installation including a 3m high ‘lamp post’ style relief vent stack with all ancillary services and associated site works to alter the network pressure.
Hazel Brooke Parkadallane Co. Cork
(1) The retention of an existing domestic garage/store, (2) for alterations to the front and side of existing dwelling and a single storey extension to the side of same dwelling and all associated and site works.
Ballyvorisheen TD & Ballyviniter Lower TD Mallow Co. Cork
Extensions to dwellinghouse
Meadowbrook Spaglen Mallow
Permission for the construction of playing/training lights and all associated works
Parkadallane, Mallow, Cork, P51YP08
Permission for development to consist of the erection of 6 No. playing/training floodlights at the existing pitch, together with all associated works.
Keatleysclose, Mallow, Co. Cork
Permission for Retention of a temporary portacabin including holding tank, which was retained on site used for staff welfare after the construction period, and Permission for the demolition of this existing portacabin and construction of a new pre-fabricated portacabin, including holding tank for use as staff welfare and all associated site development works.
ESB 110 kV Substation St. Josephs Road Carrigoon Beg Mallow, Co.Cork
Retention Permission for a temporary portacabin and permission for the demolition of a temporary portacabin and construction of a new pre-fabricated portacabin of 49s.q.m., and all associated site development works.
ESB 110kv Station St. Josephs Road Carrigoon Beg Mallow, Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?