← Back to search

Sparrograda Ballydehob

INCOMPLETED APPLICATION

Planning application 06/503

Cork - Cork County Council

Application Details

Location
Sparrograda Ballydehob
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
24 March 2006Other applications received that week
Status
INCOMPLETED APPLICATION
Decision
Pending

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

49m
00/4462CONDITIONAL21 Jul 2000

Retention of dwelinghouse

SPARROGRADA, SPARROGRADA,

69m
06/1809INCOMPLETED APPLICATION8 Sept 2006

Outbuilding consisting of stable, stable/tackroom and shed for storage

Sparrograda Ballydehob

70m
10/4INCOMPLETED APPLICATION6 Jan 2010

Construction of detached stable and store building

Sparrograda, Ballydehob, Co. Cork

70m
10/22CONDITIONAL15 Jan 2010

Construction of detached stable and store building

Sparrograda, Ballydehob, Co. Cork

381m
07/3012REFUSED3 Dec 2007

Construction of a dwellinghouse, domestic garage, sewage treatment unit and associated site works

Derreennaclogh Ballydehob Co. Cork

381m
08/1419INCOMPLETED APPLICATION30 Jul 2008

Dwellinghouse, domestic garage, sewage treatment unit and associated site works

Derreennaclogh Ballydehob

381m
08/1551WITHDRAWN22 Aug 2008

Construct dwellinghouse, domestic garage, sewage treatment unit and associated site works

Derreennaclogh Ballydehob Co. Cork

432m
09/22CONDITIONAL16 Jan 2009

Dwellinghouse, installation of mini treatment plant system and associated site works

Derreennaclogh Ballydehob

446m
23/130REFUSED13 Mar 2023

A wind farm with an operational lifespan of 30 years, from commissioning, which will connect to the national grid. The proposed wind farm will consist of 7 no. wind turbines with blade tip heights of up to a maximum of 150 metres, and associated foundations and hardstand areas. The proposed development includes a site substation compound with security fencing and a single storey control building and associated loop-in infrastructure to tie into an existing 38kV overhead transmission line, underground cabling, drainage and service infrastructure, bored well, 1 no. permanent meteorological mast of 92 metres in height, tree felling and a temporary construction compound. The development includes landscaping and all associated ancillary development works. Vehicular access will be via an upgraded existing site entrance off the L8456 local road with provision made for the upgrade of existing on-site tracks and the construction of new on-site access roads. It will also include widening of two junctions along the turbine delivery route. The first is at the N71 - R592 junction in Knockroe townland, east of Ballydehob. These works will consist of the temporary removal of a section of masonry wall, public street lighting stanchion, gate, gate posts, trees and earthern berm and the raising of levels with engineered fill to that of the adjacent N71. The second is at the N71 - L8456 junction in Shronagree townland. These works will consist of the lowering of ground levels to that of the adjacent N71 and L8456 and the removal of traffic signage. Both locations to be restored following turbine delivery. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared and will be submitted to the Planning Authority with the application.

Shronagree, Ballybane East & Knockroe Townlands Ballydehob and Letterlicky Middle Bantry, Co. Cork

492m
13/344INCOMPLETED APPLICATION18 Jun 2013

Replacement of the existing septic tank to the existing detached two storey house with a new packaged waste water treatment system and polishing filter including all ancillary site works

Derreennaclogh, Ballydehob, Co. Cork

The submission window has closed

Observations on this application closed on Thursday 27 April 2006, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?