Proposed Development
of existing rear two-storey extension to existing office premises adjoining Broadwiew House
View the full application file on the council's planning portal →Application Timeline
Application received
1 Mar 2006
Decision: CONDITIONAL
24 Apr 2006
Decision due
25 Apr 2006
Grant issued
29 May 2006
Application Details
- Location
- Broadview House Mallow Co. Cork.
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 1 March 2006
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 24 April 2006
- Grant Date
- 29 May 2006
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
retention and demolition of existing rear first floor extension to Boadview House and alterations to rear facade after demolition, new vehicualar entrance, demolition of existing outhouse and new car park to rear
Broadview House West End Mallow Co. Cork.
Demolition of 2 semi detached houses and ancillary boundary walls; To widen, modify and extend an existing entrance to the east of these houses and to construct a boundary wall within their land
Annabella Mallow Co. Cork
mixed development at West End and Park Road, the proposed development consists of demolition of existing workshop buildings and construction of 4 no. ground floor retail units and a total of 34 no. residential apartments at 1st, 2nd and 3rd floor levels the application is to include a new vehicular entrance onto an underground car park from the Park Road and an entrance into the residential development from West End, the application incudes ground level and off road car parking and all ancillary site works
West End & Park Road Mallow Co. Cork.
Construct a new staff car park including a new access/entrance point.The proposed works will include (1) a new staff car park with a dense bitumen macadam surface finish, lighting, storm drainage incorporating gulleys, petrol interceptors, stormwater attenuation tank and attenuated discharge to Linehan’s Stream and (2) new access from Thomas Davis Street, including associated gates. The application relates to an establishment which has an Industrial Emissions Licence (PO403-03).
Thomas Davis Street Mallow Co.Cork
Permission for the phased demolition of buildings (11.887m2 in total) on lands of 2.80 hectares (6.92acres) in Mallow Town Centre, in the townland of Annabella, Mallow, Co. Cork.
Mallow Town Centre Annabella Mallow Co Cork
The construction of a new 215mm solid block boundary wall with piers, of between 2.0-2.4m in height, plastered and capped, and new footpath, between the existing staff car park at Dairygold’s Nutritional Campus and 5 West End. The proposed development will also consist of the reinstatement of the original vehicular access via the archway between 6-7 West End (existing pedestrian/cyclist access, and existing gates to be retained); the blocking up of the existing northern pedestrian access from the existing car park (to match the existing boundary wall); and all ancillary works, including: the removal of existing internal bollards; the removal of the existing guardrail on West End; and the replacement of existing concrete footpath along West End; as well as all site development, drainage and landscaping works. There are no works proposed to the existing buildings at 5,6 and 7 West End (Protected Structures Reg. Nos. 100,101, and 102). The application relates to an establishment which has an Industrial Emissions License (P0403-03).
The existing staff car park at Dairygold's Nutritional Campus and 5, 6 and 7 West End, Annabella Mallow, Co. Cork
The construction of a new 215mm solid block boundary wall with piers, of between 2.0-2.4m in height, plastered and capped, and new footpath, between the existing staff car park at Dairygold’s Nutritional Campus and 5 West End. The proposed development will also consist of the reinstatement of the original vehicular access via the archway between 6-7 West End (existing pedestrian/cyclist access, and existing gates to be retained); the blocking up of the existing northern pedestrian access from the existing car park (to match the existing boundary wall); and all ancillary works, including: the removal of existing internal bollards; the removal of the existing guardrail on West End; and the replacement of existing concrete footpath along West End; as well as all site development, drainage and landscaping works. There are no works proposed to the existing building at 5,6 and 7 West End (Protected Structures Reg. Nos. 100,101, and 102). The application relates to an establishment which has an Industrial Emissions License (P0403-03).
The existing staff car park at Dairygold's Nutritional Campus & 5,6 and 7 West End, Annabella, Mallow, Co. Cork
Proposed internal alterations, refurbishment and partial change of use (1082sqm) from office to residential of No’s 5, 6 and 7 West End, Mallow, Co. Cork (Protected Structures Reg, No’s 100, 101 and 102) to provide 13 no. apartments (2 no. studio, 6 no. 1-bed and 5 no. 2-bed) an ancillary split-level management office and ancillary storage areas. External proposals include a new bicycle/refuse store, minor amendments to the existing car park and all associated site works. No alteration to the existing external elevations are proposed.
No's 5, 6 and 7 West End Mallow Co. Cork
Alteration/modification of the previously permitted (Ref: 21/6805) internal alterations, refurbishment and change of use of the apartment and office building (Protected Structures Reg. No’s 100,101 & 102). The proposed amendments include: (1) Provision of 2 No. additional residential units (1 bed split level) in lieu of the previously permitted management office at basement and ground floor levels (15 No. residential units in total); (2) Amending Unit 04 at ground floor to a 1 bed unit; (3) Provision of new staircase from the ground to basement in No. 5 West End; (4) Internal wall insulation proposed to external walls of basement level; (5) Internal alterations to third floor and provision of 2 No. roof AOVs; (6) Provision of 4 No. additional resident car parking spaces in lieu of the previously permitted staff parking.
5, 6 & 7 West End Mallow Co Cork
Permission for development at this site of approximately 0.0352 hectares located at the permitted pharmacy and office units (totaling 317.2 sqm gross floor space) of the newly constructed Lidl licensed discount food store (granted permission under Cork County Council planning reg ref no. 20/5063). The proposed development consists of the change of use of the constructed pharmacy unit (173.8sqm) to shop as defined in article 5(1) of the Planning and Development Regulations 2001 (as amended); the change of use of the constructed office unit (139.6sqm) to shop as defined in article 5(1) of the Planning and Development rRgulations 2001 (as amended); and associated signage (totaling 6.12sqm)
West End & Park Road (N72) Annabella Mallow co.Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?