No. 2 Meadow Grove Mallow Co. Cork
NEW APPLICATIONPlanning application 06/55071
Cork - Cork County Council
Proposed Development
change of use from dwelling to surgery and associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
11 Oct 2006
Decision due
5 Dec 2006
Application Details
- Location
- No. 2 Meadow Grove Mallow Co. Cork.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 11 October 2006
- Status
- NEW APPLICATION
- Decision
- Pending
- Decision Due
- 5 December 2006
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
erection of a digital close circuit television system comprising of 13 cameras, 10 cameras shall be mounted on 5m high close circuit television columns and 3 cameras will be building mounted
Summerhill Mallow Co. Cork.
Construction of a single storey deposit return scheme unit c. 35 sq.m, which comprises a publicly accessible entrance area with the remainder of the unit accommodating an internal recycling receptacle, resulting in a reduction of 4 no. car parking spaces [total of 98 car parking spaces at the site] and all associated site development works.
Aldi Discount Foodstore Old Cork Road Ballydahin Ballydaheen Mallow Co Cork
Permission for construction of an extension to the front of existing dwelling
No. 18 Meadow Grove, Summerhill, Mallow Co. Cork.
The development will consist of the demolition of existing buildings and the construction of a single storey discount foodstore, 1,560sqm, Gross Floor Area (net Retail Floor Area 1,125sqm) including the sale of alcohol for consumption off the premises; 100 no surface car parking spaces, a double sided road sign (each side 5.11sqm) Gable signage (5.11sqm) external plant enclosure, boundary wall and railling; attenuation; all associated landscaping and site development works.
Ballydahin Td Mallow Co Cork
demolition of an existing dwelling house and construction of four semi-detached houses and associated site works
Old Cork Road, Mallow Co. Cork.
Construction of 4 no semi-detached dwellings and relocation of vehicular access
Old Cork Road Mallow Co Cork
Permission for an attic conversion and alterations of elevations of dwelling to include a first floor window on gable and two no. dormer windows to front of dwelling also one no. velux window to side of dwelling
Setanta Meadow Grove Mallow Co. Cork.
Permission to demolish existing structures and construct mmixed commercial development consisting of 4 blocks and underground car park
Ballydahin Mallow Co. Cork.
The construction of a single-storey extension to the rear of dwelling house, the alteration of rear elevation and the change of roof covering of the existing dwelling house from tiles to slate.
No 20 Meadow Grove Summerhill Carhookeal Mallow, Co. Cork
The demolition of existing structures including the decommissioning and removal of 7 no. fuel storage tanks on site and the construction of an unmanned fuel service station consisting of 1) 2 no. fuel pumps with canopy over, dispensing petrol and diesel on each side; 2) 4 no. new underground tanks for fuel storage; 3) the erection of 1 no. totem sign; and 4) all associated ancillary development works including vehicular access, landscaping, drainage, plant and services area.
Former Topaz Fuel Depot Ballydahin, Old Cork Road Mallow Co.Cork
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?