Quartertown Ind Est Mallow Co Cork
CONDITIONALPlanning application 06/55085
Cork - Cork County Council
Proposed Development
Construction of an extension to existing building for light, industrial, warehouse. distribution use with office area and associated works.
Application Timeline
Application received
29 Nov 2006
Decision due
1 Feb 2007
Decision: CONDITIONAL
24 Apr 2007
Grant issued
24 May 2007
Application Details
- Location
- Quartertown Ind Est Mallow Co Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 29 November 2006
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 24 April 2007
- Grant Date
- 24 May 2007
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Retention of existing ancillary cladded buildings and plastic tank to side of existing industrial unit as erected on site and planning permission for the construction of a new extension and alterations to the industrial unit for use in association with the existing packaging facility being carried out in the said industrial unit.
Quartertown Industrial Estate Quartertown Lower Quartertown Mallow, Co. Cork
Retention for changes to roof structure to extensions to rear and modification to roadside elevation to the existing building from that granted under Planning Permission P.D. 2099
Quartertown Ind. Estate Quartertown Mallow Co. Cork.
Retention of 1 No. existing cladded building used for storage of packaging equipment, 1 No. cladded building used as compressor room and 1 No. plastic water storage tank all to side of existing industrial unit and planning permission for the construction of a new extension and alterations to the industrial unit for use in association with the existing packaging facility being carried out in the said industrial unit.
Quartertown Industrial Estate Quartertown Mallow Co. Cork
Consturction of a toilet building within their existing allotment area adjacent to the Hi-Cone building as well as the laying of a new sewer through the Hi-Cone site to connect to the existing public sewer on the adjacent industrial estate road
Quartertown Lower Mallow Co. Cork.
Extension on west side of existing production building and construction of a new detached boiler house at the rear of the production building
Quartertown Industrial Estate Quartertown Lower Mallow Co.Cork
An extension on the west side of the existing production building and the construction of a new detached boiler house at the rear of the production building. The application relates to development which comprises an activity requiring an integrated pollution prevention and control licence.
Quartertown Industrial Estate Quartertown Lower Mallow
The construction of a warehouse/production building extension on the eastern side of the existing warehouse/production building
Quartertown Industrial Estate Mallow Co. Cork
The development will consist of a warehouse extension to the eastern side of the existing warehouse/production building, utilities area including tank farm and utilities equipment, additional parking and all associated site works. The application relates to a development which comprises an activity requiring an integrated pollution prevention and control licence.
Quartertown Industrial Estate Quatertown Lower Mallow Co. Cork
a) both an extension and alterations to the facades of the existing showroom including signage b) alterations to the rear facade of the existing workshop and c) construction of a concrete decked sales yard with a contrete access stairs and a metal vehicle access ramp and associated site works
Quartertown Ind. Estate Quartertown Mallow Co. Cork.
Elevation alterations to the North, East and West of existing industrial building (known as the Hi-Cone facility). The alterations include new cladding, new entrance canopy, and 2no. access doors, signage and associated site works
Quartertown Industrial Estate Quartertown Mallow
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?