← Back to search

Fermoy Golf Club Ballynahina Fermoy

CONDITIONAL

Planning application 06/9868

Cork - Cork County Council

Proposed Development

Erection of 6m high mesh fence at 15th hole

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    18 Aug 2006

  2. Decision: CONDITIONAL

    11 Oct 2006

  3. Decision due

    12 Oct 2006

Application Details

Location
Fermoy Golf Club Ballynahina Fermoy
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
18 August 2006Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
11 October 2006

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

238m
07/6852CONDITIONAL5 Apr 2007

Construction of livestock house with slatted slurry tank, slatted slurry channel, extension to silage slab and associated works

Ballinahina Fermoy

241m
07/11715CONDITIONAL17 Oct 2007

Alterations and extension to dwelling and retention of conversion of attic to living accommodation

Ballynahina Fermoy

259m
08/6126CONDITIONAL17 Apr 2008

Livestock housing with slatted slurry tank and concrete apron

Ballynahina Fermoy

281m
07/6666WITHDRAWN30 Mar 2007

Dwelling, garage, treatment unit and associated site works

Coolmucky Fermoy

362m
03/4796CONDITIONAL25 Sept 2003

Attic conversion and extension to dwelling

CULLENAGH, CULLENAGH, BALLYNAHINA,

460m
07/12840CONDITIONAL4 Dec 2007

Construction of domestic garage and retention of conversion of attic

Ballynahina Fermoy

460m
08/7022CONDITIONAL30 May 2008

Retention of conversion of attic of dwellinghouse to living accommodation

Ballynahina Fermoy

460m
08/6543INCOMPLETED APPLICATION6 May 2008

Retention of attic conversion

Ballynahina Fermoy

486m
18/6673CONDITIONAL10 Oct 2018

Retention of materials recovery facility. The proposed development will consist of (a) Retention of (1) an existing waste sorting building, (2) office building, (3) temporary workshop building, (4) weighbridge, (5) generator building, (6) electrics building, (7) vehicle wash area, (8) fire water holding tank and plant room, (9) skip storage area, (10) external waste processing area, (11) external construction and demolition (C&D) waste storage area, (12) foul and surface water tanks, (13) bored well and (b) Permission for: (1) demolition of the existing waste sorting building (damaged by fire), office building and temporary workshop/store, (2) removal of the 3 no. portacabins, (3) construction of an office building, (4) construction of a waste sorting building, (5) installation of a septic tank, (6) modifications to the existing access including the provision of entrance gates, and (7) all ancillary external storage of materials, parking, landscaping and site development works, No. change is proposed to the annual tonnage of 6,500 tonnes per annum. The proposed development comprises and activity requiring a Waste Licence.

Cullenagh Fermoy Co. Cork

487m
20/5919CONDITIONAL4 Sept 2020

The increase to the annual tonnage from 6,500 tonnes per annum to 16,500 tonnes per annum at a resource, recovery and recycling facility. The proposed development comprises an activity requiring a Waste Licence.

Cullenagh Fermoy Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?