Munster Joinery Lacka Cross Lackanastooka Ballydesmond
INCOMPLETED APPLICATIONPlanning application 07/10679
Cork - Cork County Council
Proposed Development
Construction of single storey building to house equipment for treatment of water based waste paints for the purpose of reducing wastes exported from the site
View the full application file on the council's planning portal →Application Details
- Location
- Munster Joinery Lacka Cross Lackanastooka Ballydesmond
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 3 September 2007
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of single storey building with bunding to house equipment for treatment of water based waste paints
Lacka Cross Lackanastooka Ballydesmond
Construction of extension to main joinery building to increase production area and replacement of existing compressed air facility
Munster Joinery Lacka Cross Lackanastooka Ballydesmond
Construction of single storey building to house equipment for treatment of water based paints for the purpose of reducing wastes exported from the site
Munster Joinery Lacka Cross Lackanastooka Ballydesmond
Construction of sales building for storage of doors and windows for resale
Munster Joinery Lacka Cross Lackanastooka Ballydesmond
Construction of service building for storage of glass panels and accessories
Munster Joinery Lacka Cross Lackanastooka Ballydesmond
Construction of off size sales building for storage of doors and windows for resale to general public
Munster Joinery Lacka Cross Lackanastooka Ballydesmond
The development will consist of a 0.28ha Fire Water Retention Pond. The pond will have a storage capacity of 4400m³. This project will form part of the works for the existing IPPC Licence governing the facility. A Natura Impact Statement has been submitted with the application.
Lacka Cross Lackanastooka Ballydesmond
A 0.28ha Fire Water Retention Pond. The pond will have a storage capacity of 4400 metres cubed.
Lacka Cross Lackanastooka Ballydesmond Co.Cork
The construction of a 172-space car park facility, complete with a storm water attenuation tank, oil interceptor, access footpath, lamp posts and landscaping works (8763 sq.m total) at the Gairdini facility. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application.
Lackanastooka Ballydesmond Co. Cork
A 0.28ha fire water retention pond and all ancillary site works. The pond will have a storage capacity of 4400metres cubed.
Lacka Cross Lackanastooka Ballydesmond
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?