Eircom Exchange Dromgarvan Adrigole
INCOMPLETED APPLICATIONPlanning application 07/2842
Cork - Cork County Council
Proposed Development
Construct 25m support pole to carry 3no. 2.8m radio aerials for use by emergency services (garda, ambulance and fire brigade) and associated equipment for new national digital radio service (NDRS)
Application Details
- Location
- Eircom Exchange Dromgarvan Adrigole
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 12 November 2007
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construct 25m support pole to carry 3no. 2.8m radio aerials for use by emergency services (garda, ambulance and fire brigade) together with associated equipment for new national digital radio service (NDRS)
Eircom Exchange Dromgarvan Adrigole
Extension (one and half storey's high) to side of existing dwelling
Heath House Dromgarvan Adrigole
Extension (one and half storeys high) to side of existing dwelling
Heath House Dromgarvan Adrigole
Extension (one and half storey) to side of existing dwelling
Heath House Dromgarvan Adrigole
Extension to dwellinghouse and construction of domestic garage
DROMGARVAN, DROMGARVAN,
Outline permission for construction of dwelling house, installation of wastewater treatment system and all associated site works
Site A Adrigole Beara Co. Cork
Construction of adventure resort to include: (A) Change of use of an existing dwelling (including extension and alteration of same) to staff/admin reception with retail outlet and first floor apartment for staff use, (B) 2no. detached buildings each consisting of 4no. self contained accommodation units for use in conjunction with the adventure resort and for short term/holiday letting, (C) Detached barn style communal building for instruction, recreation and attached climbing tower, (D) all associated infrastructure including waste water treatment plant and landscaping works, new vehicle access, upgrading of existing access track, new parking and turning area, footpath network, rope courses and bin store
Adrigole Beara
The construction of an adventure resort to include: a. the change of use of an existing dwelling (including extension and alteration of same) to staff/admin reception with retail outlet and first floor apartment for staff use. b. 2no. detached buildings each consisting of 4no. self contained accommodation units for use in conjunction with the adventure resort and for short term/holiday letting. c. a detached barn style communal building for instruction, redcreation and attached climbing tower d. all associated infrastructure including waste treatment plant and landscaping works, new vehicle access, upgrading of existing access track, new parking and turning area, footpath network, rope courses ect
Adrigole Beara Co. Cork
Outline permission for construction of dwelling house, installation of wastewater treatment system and all associated site works
Site B Adrigole Beara Co. Cork
A change of use of ground floor public house, to residential use, incorporating existing residential area in first floor and second floor (formally hotel accommodation) to become 1 no. dwelling house, with minor alterations to elevations. Also on northern elevation, permission to demolish existing store room and the construction of a hipped roof to replace flat roof. And construction of a waste water treatment system with associated site works
Glenbrook Bar Adrigole Beara Co. Cork
The submission window has closed
Observations on this application closed on Sunday 16 December 2007, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?