Application Timeline
Application received
12 Jan 2007
Decision: CONDITIONAL
6 Mar 2007
Decision due
8 Mar 2007
Grant issued
11 Apr 2007
Application Details
- Location
- Coolcloher South Boherbue
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 12 January 2007
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 6 March 2007
- Grant Date
- 11 April 2007
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Dwellinghouse
Coolcloher Cloonbannin Mallow
Dwellinghouse
Coolcloher South Cloonbannin Mallow
Dwellinghouse and installation of septic tank
Coolcloher South Cloonbannin Mallow
4 no. dwellinghouses
Coolcloher South Cloonbannin Mallow
Permission for the refurbishment and extension of existing cottage. The proposed development will include the following: (1) Demolition of an existing single-storey extension and outbuilding at the rear of the existing cottage; (2) Construction of a new single-storey extension to the original dwelling, including a link structure between the proposed extension and the existing cottage; (3) New openings and alterations to existing façades; (4) A new vehicular site entrance and reinstatement of the original road boundary; (5) Decommissioning and removal of the existing septic tank and installation of a new wastewater treatment system; (6) All associated site ancillary works.
Coolcloher South, Boherbue, Co. Cork.
Permission for refurbishment and extension of existing cottage. The proposed development will include the following: (1) Demolition of an existing single-storey extension and outbuilding at the rear of the existing cottage; (2) Construction of a new single-storey extension to the original dwelling, including a link structure between the proposed extension and the existing cottage; (3) New openings and alterations to existing façades; (4) A new vehicular site entrance and reinstatement of the original road boundary; (5) Decommissioning and removal of the existing septic tank and installation of a new wastewater treatment system; (6) All associated site ancillary works.
Coolcloher South, Boherbue, Mallow, Co. Cork.
Permission for the refurbishment and extension of existing cottage. The proposed development will include the following: (1) Demolition of an existing single-storey extension and outbuilding at the rear of the existing cottage; (2) Construction of a new single-storey extension to the original dwelling, including a link structure between the proposed extension and the existing cottage; (3) New openings and alterations to existing façades; (4) A new vehicular site entrance and reinstatement of the original road boundary; (5) Decommissioning and removal of the existing septic tank and installation of a new wastewater treatment system; (6) All associated site ancillary works.
Coolcloher South, Boherbue, Mallow, Co. Cork.
Permission for alterations and extensions to existing dwelling consisting of the following: (1) The removal of roof over existing dwelling and to construct a new first floor extension over same dwelling, (2) To demolish existing extension to rear of existing dwelling and to construct a new part 2 storey / part single storey extension to the rear of same dwelling, (3) For alterations to the front façade of existing dwelling including the construction of new front entrance porch, (4) The Construction of a new site entrance to existing property and (5) To replace existing septic tank serving existing dwelling and to install a new secondary wastewater treatment system and tertiary filter to serve same dwelling and all associated site works and services.
Coolclogher South TD. Boherbue Co. Cork
Permission for alterations and extensions to existing dwelling consisting of the following: (1) The removal of roof over existing dwelling and to construct a new first floor extension over same dwelling, (2) To demolish existing extension to rear of existing dwelling and to construct a new part 2 storey / part single storey extension to the rear of same dwelling, (3) For alterations to the front façade of existing dwelling including the construction of new front entrance porch, (4) The construction of a new site entrance to existing property and (5) To replace existing septic tank serving existing dwelling and to install a new secondary wastewater treatment system and tertiary filter to serve same dwelling and all associated site works and services.
Coolcloher South Boherbue Co. Cork
To construct a new dwelling house and domestic garage served by mechanical aeration unit and sand polishing filter.
Cloonbannin East Mallow Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?