Proposed Development
Material change of use of cubicles to calf house and construction of an animal house incorporating a slatted tank, feed trough, walkway, feed rail and feed passage
View the full application file on the council's planning portal →Application Timeline
Application received
8 Mar 2007
Decision due
2 May 2007
Decision: CONDITIONAL
2 May 2007
Grant issued
5 Jun 2007
Application Details
- Location
- Ballard Araglin
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 8 March 2007
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 2 May 2007
- Grant Date
- 5 June 2007
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Dwelling house, domestic garage, wastewater treatment system with polishing filter and all associated site works
Ballard Araglin
Dwelling house, septic tank and percolation area, shed containing stables and fodder store, dungstead with underground effluent tank, vehicular entrance and all ancillary works
Billeragh West Araglin Kilworth Co.Cork
Construction of single storey one-classroom extension with resource room, staff room, interior alterations and all ancillary site works
Billeragh West Araglin Co.Cork
Construction of soiled water tank, slatted cubicle house incorporating feed passage, floatation channel and animal house incorporating straw bedded area and slatted tank and ancillary concrete works
Billeragh West Araglin Kilworth
Dwellinghouse, detached garage and installation of septic tank
Billeragh West Araglen
combined waste and power facility with new entrance to public road, main tank farm (total of 20 tanks) including digester, storage, prestorage and anaerobic biofilter tanks with pumps and heat exchangers (24.29m high), 2 no. gas flares 37.3m high and 2 no. gas cleaning vessels 22m high; garage; admin. building comprising canteen, laboratory and two storey office area; storage hall; powerhouse; reception building to include truck wash, boiler room, workshop, reception areas, two underground storage tanks and gas treatment and metering area; gas engine stack 30.3m high; processing building to include band dryer, separation, evaporation, condensate, pellitizer, reactor areas, reception tanks and gas flares 37.3 high; tank farm of 8 storage, test digester and recycling tanks. Ancillary facilities will include 2 no. fire ponds, 2 no. weighbridges, pipe racks, 6 no. cooling towers 9.97m high, wells,security gates and fencing, roads,retaining walls, ramp and embankment
Ballard Araglin Fermoy
Construction of combined waste and power facility
Ballard Araglin Fermoy
Glamping site with 17 no. glamping pods and a communal building consisting of toilets, office, kitchen, dining and lounge area, septic/settlement tank and an integrated constructed wetland system together with all associated site works. A Natura Impact Statement will be submitted to the Planning Authority with the application.
Billeragh West Araglin Co. Cork
Dwellinghouse and garage
Curraghanolomer Araglin Kilworth
Dwellinghouse and garage
Curraghanolomer Araglin Kilworth
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?