Proposed Development
Demolition of existing dwelling and construction of creche and residential development of 130 no. dwellinghouses comprising of 74 no. semi-detached dwellinghouse, 4 no. blocks of 4 no. terraced dwellings, 12 no. blocks of 3 no. terraced dwellings and 4 no. detached dwellings and all associated site development works and services
View the full application file on the council's planning portal →Application Timeline
Application received
14 Mar 2007
Decision: CONDITIONAL
28 Nov 2007
Decision due
29 Nov 2007
Grant issued
9 Jan 2008
Application Details
- Location
- Hazel Brook Spaglen Mallow
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 14 March 2007
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 28 November 2007
- Grant Date
- 9 January 2008
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Residential development - 138 no. dwellinghouse comprising of 78 no. semi-detached dwellings, 32 no. terraced dwellinghouses in 8 no. blocks of 4 no. dwellings, 24 no. terraced dwellings in 8 no. blocks of 3 no. dwellings and 4 no. detached dwellings, creche with 4 no. first floor apartments and all associated site development works
Hazel Brook Spaglen Mallow
The construction of 18 no. dwellings houses consisting of 14 no. Type G, 3 bedroom semi detached dwellings, 4 no. Type C, 3 bedroom semi detached dwellings and ancillary site works. The proposed development is a change of plan and change of house type from that permitted under planning reference no. ABP-301429-18.
Hazel Hill Hazel Brooke Spaglen Mallow, Co. Cork
The construction of a strategic housing development comprising of 148 no. residential units, a creche, the provision of landscaping and amenity area to include 3 no. local play areas and 3 no. neighbourhood play areas and all associated ancillary development to include the provision of improved pedestrian facilities including the installation of dropped kerbs and tactile paving, new pedestrian crossings and the realignment and improvement of the spa road junction and footpaths to the west, lighting, drainage, boundary treatments and bicycle & carparking and bin storage. Extension of Duration to Permission granted under Planning Ref. No. ABP Ref 301429-18 (as amended by ABP 311986-21)
Hazel Brooke Spaglen Mallow Co.Cork
Construction of water service control building with underground contact and reservoir tanks and associated site development works
Hazelbrook Spaglen Mallow
66 no. dwellinghouses (change of plan and house design from those permitted for phase one of residential development previously permitted under Reg. no. 03/166)
Spaglen Mallow
Residential development -210 no. dwellinghouses
SPAGLEN RURAL, SPAGLEN RURAL,
Retention and completion of alterations to 6 no. dwellings, re-orientation of 2 no. dwellings and minor repositioning of 6 no. dwellings permitted under 05/2837
Spaglen Mallow
Construction of water service control building with underground contact and reservoir tanks and associated site development works
Hazelbrook Spaglen Mallow
Retention of (1) Conversion of attic space for the purpose of storage space. (2) Installation of two roof-lights to the rear roof of dwellinghouse for natural light to attic space. (3) Installation of access staircase to attic space
No. 18 Hazel Brook Spaglen Mallow Co. Cork
To construct a two-storey house and all associated site works.
26a Hazelbrooke Spa Glen Mallow Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?