Application Details
- Location
- Mishells Bandon
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 13 July 2007
- Status
- WITHDRAWN
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Dwellinghouse and installation of domestic waste water treatment unit
Mishells Bandon
Construction of extensions to dwelling
Mishells Bandon
Construction of loose cattle shed, milking parlour, soiled water tank, concrete apron, overground slurry storage tank and associated site works
Mishells Bandon
Dwellinghouse with access roadway
MISHELLS, MISHELLS,
Construction of a new detached dwelling house, detached garage and the installation of a waste water treatment plant and all associated site works.
Mishells Bandon Co. Cork
2km of grid connection infrastructure on the public road and agricultural land to connect the approved Finnis Solar Farm (Planning reference 17/6111) to the existing Bandon Substation and to connect two parcels of land within the consented development comprising the laying of underground electricity cables, associated infrastructure and horizontal directional drilling.
Finnis Mishells Bandon Co Cork
Construction of livestock housing with 2 no. slatted tanks and associated works
Mishells Bandon
2km of grid connection infrastructure on the public road and agricultural land to connect the approved Finnis Solar Farm (Planning Reference 17/6111) to the existing Bandon Substation and to connect two parcels of land within the consented development comprising the laying of underground electricity cables, associated infrastructure and horizontal directional drilling.
Finnis Mishells Bandon Co. Cork
Retention of conservatory and first floor extension to dwellinghouse
Mishells Bandon
Demolition of dwelling and outbuilding and construction of dwellinghouse and garage
Mishells Bandon
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.