Planning application 07/9590

Cork - Cork County Council

Application Details

Location
Mishells Bandon
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
13 July 2007
Status
WITHDRAWN
Decision
Pending

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

112m
04/9481REFUSED21 Dec 2004

Dwellinghouse and installation of domestic waste water treatment unit

Mishells Bandon

137m
05/9772CONDITIONAL23 Dec 2005

Construction of extensions to dwelling

Mishells Bandon

146m
06/9630CONDITIONAL10 Aug 2006

Construction of loose cattle shed, milking parlour, soiled water tank, concrete apron, overground slurry storage tank and associated site works

Mishells Bandon

172m
03/2548CONDITIONAL28 May 2003

Dwellinghouse with access roadway

MISHELLS, MISHELLS,

179m
16/5713CONDITIONAL11 Jul 2016

Construction of a new detached dwelling house, detached garage and the installation of a waste water treatment plant and all associated site works.

Mishells Bandon Co. Cork

197m
22/5234CONDITIONAL30 May 2022

2km of grid connection infrastructure on the public road and agricultural land to connect the approved Finnis Solar Farm (Planning reference 17/6111) to the existing Bandon Substation and to connect two parcels of land within the consented development comprising the laying of underground electricity cables, associated infrastructure and horizontal directional drilling.

Finnis Mishells Bandon Co Cork

220m
07/9114CONDITIONAL28 Jun 2007

Construction of livestock housing with 2 no. slatted tanks and associated works

Mishells Bandon

220m
22/4890INCOMPLETED APPLICATION20 Apr 2022

2km of grid connection infrastructure on the public road and agricultural land to connect the approved Finnis Solar Farm (Planning Reference 17/6111) to the existing Bandon Substation and to connect two parcels of land within the consented development comprising the laying of underground electricity cables, associated infrastructure and horizontal directional drilling.

Finnis Mishells Bandon Co. Cork

287m
05/6099CONDITIONAL24 Aug 2005

Retention of conservatory and first floor extension to dwellinghouse

Mishells Bandon

308m
06/10908CONDITIONAL26 Sept 2006

Demolition of dwelling and outbuilding and construction of dwellinghouse and garage

Mishells Bandon

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?