← Back to search

Ballynoe Cobh

CONDITIONAL

Planning application 08/4727

Cork - Cork County Council

Proposed Development

Construction of single storey extension to dwelling

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    13 Feb 2008

  2. Decision due

    8 Apr 2008

  3. Decision: CONDITIONAL

    8 Apr 2008

  4. Grant issued

    9 May 2008

Application Details

Location
Ballynoe Cobh
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
13 February 2008Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
8 April 2008
Grant Date
9 May 2008

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

194m
03/999CONDITIONAL10 Mar 2003

Garage/loft

GLENLEE, GLENLEE, BALLYNOE,

216m
06/12534REFUSED22 Nov 2006

Residential development of 9 no. terraced dwellinghouses in 3 no. blocks and associated works

Hermitage Drive Ballynoe Cobh

388m
16/7176CONDITIONAL16 Dec 2016

a) Change of use of 2 no. commercial units to 4 no. 2-bedroom apartments at ground floor level, b) Change of Use of 3 no. offices units to 4 no. 2-bedroom apartments at first floor level, c) Alterations to the Northeast, Northwest, and Southeast Elevation of the existing building to incorporate revised/new window and door locations to coincide with proposed apartment layout, d) All associated site works.

Rushbrooke Centre Ballynoe Cobh Co. Cork

388m
16/6896INCOMPLETED APPLICATION21 Nov 2016

(a) change of use of 2 no. commercial units to 4 no. 2 bedroom apartments at ground floor level (b) change of use of 3 no. office units to 4 no. 2 bedroom apartments at first floor level (c) alterations to the northeast, northwest and southeast elevations of the existing building to incorporate revised/new window and door locations to coincide with proposed apartment layouts, (d) all associated ancillary site works

Rushbrooke Centre Ballynoe Cobh, Co Cork

736m
23/4995CONDITIONAL17 May 2023

Permission for decommissioning of existing septic tank and percolation area, and installation of a wastewater treatment plant and a packaged prefabricated tertiary treatment unit to serve dwelling.

Carrigmahon House Carrigmahon Monkstown Co. Cork

894m
19/4563CONDITIONAL7 Mar 2019

Modifications to existing dwellinghouse, namely; A) construction of a single storey extension onto the rear of existing single storey annex at rear of cottage/dwelling and B) insert a velux rooflight to front roof of dwellinghouse.

19 Newtown Cottage Ringmeen Cobh Co. Cork

900m
12/5449CONDITIONAL4 Jul 2012

Modifications to existing dwellinghouse to include construction of ground floor and first floor extension to rear (west) elevation of dwellinghouse

No. 18 Newtown Cottage Ringmeen Cobh

907m
07/12444REFUSED16 Nov 2007

Change of use from existing bus depot to mixed use commercial/retail/residential development comprising of 2 no. blocks, Block A, five storey building consisting of ground and first floor offices and 5 no. apartments on second, third and fourth floors, Block B, a four storey building consisting of ground floor retail units, 2 no. gated covered parking areas for cars and bicycles, stores, service yards and ESB substation and 26 no. apartments on first, second and third floors with shared terrace at first floor level, construction of basement level car park, widening of existing street and construction of footpaths and amenity area

Glenbrook Maulbaun Passage West

908m
18/4926CONDITIONAL16 Apr 2018

Modifications to existing dwellinghouse, namely, a) Construction of a first floor rear extension over existing rear single storey annex (west elevation) b ) Insert a velux rooflight to font roof of dwellinghouse and c) Alterations to existing front porch, namely i) remove existing hip roof and construct a pitched roof over, ii) elevation changes to porch, i.e, relocate external door to front elevation (east), insert window to side (north) and revised size & style of existing window on side (south).

17 Newtown Cottage Ringmeen Cobh Co. Cork

909m
08/9457CONDITIONAL24 Oct 2008

Site clearance and change of use of former bus depot to a mixed use development comprising 2 no. blocks ranging in height from three to four storeys consisting of 23 no. residential units (3 no. one bed apartments, 17 no. two bed apartments and 3 no. three bed townhouses), 121sqm retail unit at ground level, 19 no. car parking spaces and loading bay at ground level fronting the public road, 42 no. car parking spaces at sub-ground level (basement), access ramp to basement car park, hard and soft landscaping, bin stores and associated works and services including effluent treatment unit

Old Bus Depot Glenbrook Maulbaun Passage West

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.