Baltimore Harbour Baltimore Pier Baltimore
INCOMPLETED APPLICATIONPlanning application 08/49
Cork - Cork County Council
Proposed Development
Fenced enclosure of land to provide temporary accommodation of Inshore Lifeboat Station and ancillary support facilities and these temporary facilities will be transferred to existing Baltimore Life Boat station; the development will include housing of lifeboat and cradle, cabin to accommodate administration and meeting rooms, mechanical storage unit and 2 units to accommodate garments and changing
Application Details
- Location
- Baltimore Harbour Baltimore Pier Baltimore
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 11 January 2008
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Temporary accommodation of Inshore Lifeboat Station and ancillary support facilities; Development to consist of: green coloured 2m high square mesh fence between accommodation units with lockable framed mesh gate; three standard metal container units 6m x 2.4m to accommodate changing/wet gear storage and mechanics store; cabin of 30sqm to provide meeting/training and administration functions; 15no. 10litre fuel storage cans will be housed in purpose fabricated fuel bin with main refueling taking place at existing pier; Low level flood lights will be placed in compound area to assist launching and recovery of life boat during hours of darkness
Baltimore Harbour Baltimore Pier Baltimore
Erection of ice plant & store & removal of 2 no. existing units
THE NORTHERN PIER, THE NORTHERN PIER, BALTIMORE HARBOUR, BALTIMORE,
The development will consist of the refurbishment, remodelling and extension of the existing Fisheries Pier. Pier extension to accommodate 1 no. access stairway, ladders, toe rails and bollards. New vehicle access ramp and pedestrian walkway to be provided. Level of existing pedestrian walkway to be raised
Baltimore Harbour Baltimore Co. Cork
Dive centre, sailing club facility, 12 no. apartments and basement carpark
Baltimore
Erection of 2no. CCTV cameras on 2no. poles and all associated site works
The Northern Pier Baltimore Harbour Baltimore Co. Cork
Extension to dwelling
BALTIMORE, BALTIMORE,
(A) Change of use of an ancillary dwelling to use as an independent dwelling (Omission of Condition No. 2 of previous permission Ref No; 09/348, (B) New lobby at entrance door, (C) Dormer type extension to first floor. The structure is within the curtilage of Dun Na Sead Castle which is a protected structure, Ref; RPS 00809 and National Monuments Ref; C0150-036003 and C150-036002
Castle Celler Dun Na Sead Castle Baltimore Co. Cork
(A) Change of use of an ancillary dwelling to use as an independent dwelling (Omission of Condition No. 2 of previous permission Ref No; 09/348, (B) New lobby at entrance door, (C) Dormer type extension to first floor. The structure is within the curtilage of Dun Na Sead Castle which is a protected structure, Ref: RPS 00809 and National Monuments Ref; C0150-036003 and C150-0360022
Castle Cellar Dun na Sead Castle Baltimore Co. Cork
(A) Change of use of an ancillary dwelling to use as an independent dwelling (Omission of Condition No. 2 of previous permission Ref No; 09/348, (B) New lobby at entrance door, (C) Dormer type extension to first floor. The structure is within the curtilage of Dun Na Sead Castle which is a protected structure, Ref: RPS 00809 and National Monuments Ref: C0150-036003 and C0150-036002
Castle Cellar Dun Na Sead Castle Baltimore Co. Cork
(A) New lobby at entrance door (B) Dormer type extension to first floor (c) Omission of Condition no. 2 of previous Permission Ref. no; 09/348. The structure is within the curtilage of Dun na Sead Castle which is a protected structure Ref RPS 00809 and National Mounuments Ref C0150-036003 and C150-036002
Castle Cellar Dun na Sead Castle Baltimore Co. Cork
The submission window has closed
Observations on this application closed on Thursday 14 February 2008, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?