← Back to search

Keatleysclose Mallow

REFUSED

Planning application 08/7388

Cork - Cork County Council

Proposed Development

New shed for the housing of 4 no. caravans

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Jun 2008

  2. Decision due

    14 Aug 2008

  3. Decision: REFUSED

    14 Aug 2008

Application Details

Location
Keatleysclose Mallow
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
20 June 2008Other applications received that week
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
14 August 2008

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

17m
16/5259INCOMPLETED APPLICATION25 May 2016

Alteration and change of use of commercial entrance serving an existing caravan sales compound and accessories shop/workshop into a domestic entrance located and serving dwellinghouse at the south west of the property. The alteration and change of use of existing domestic entrance to commercial entrance serving the same commercial development including new driveway located at the centre of the property, construction of new domestic entrance located and to serve dwellinghouse at the north east of the property and alterations of site boundaries.

Keatleysclose Mallow

174m
13/55009CONDITIONAL25 Mar 2013

Permission for partial change of use of dwelling house to a pre-school facility

No. 4 Castle Court Castlelands Mallow Co. Cork.

377m
26/0600Awaiting F.I. Response11 Mar 2026

Permission for development to consist of the erection of 6 No. playing/training floodlights at the existing pitch, together with all associated works.

Keatleysclose, Mallow, Co. Cork

377m
25/6499Invalid - Prepare Letters17 Nov 2025

Permission for the construction of playing/training lights and all associated works

Parkadallane, Mallow, Cork, P51YP08

436m
05/55098WITHDRAWN23 Dec 2005

for 15 no. dwelling houses, 3 no. garages, upen space amenity, carparking, boundary walls, landscaping and associated services (part of the Masterplan of the Castlelands Estate)

St. Josephs Road Mallow Co. Cork.

446m
16/4887CONDITIONAL20 Apr 2016

A single storey extension to the side of the existing dwelling, alteration of existing porch and relocation of existing garage door

Hollybank St. Josephs Road Spaglen, Mallow Co. Cork

453m
07/55077CONDITIONAL22 Oct 2007

the construction of a commercial building of 3417.65m sq to include 12 no. retail units (1971 m sq) at basement and ground floors, 10 no. office units (836.5 m sq) at first floor, stores, toilets, circulation areas, 1st floor open terrace and all associated site works including retaining walls and connection to existing foul water, surface water and mains water system

Castlepark Res. Dev. St. Josephs Road Mallow Co. Cork.

453m
09/55009NEW APPLICATION27 Mar 2009

Permission for alterations to previously permitted mixed use development under PD55,077-07 consisting of (i) 5 no. office units (482sqm) at basement (4no) and development under floors, (ii) 14 no retail units (820sqm) at ground floor with associated stairs, toilets and circulation areas, (iii) residential element consisting of 11 no apartments at first floor and (iv) all site car parking, bin storage and all associated site works to be altered as follows: a) the removal of the office unit at ground floor giving 4 no. office units (375sqm) at basement floor only, b) reduction of the number of retail units by 3 no giving 11 no retail units (1483sqm) at ground floor, c) alterations to permitted north and east elevations, d)alterations to permitted car park layout to provide 108 spaces, alterations to bin storage and all associated site services

Castlepark Resid. Dev. St. Josephs Road Mallow

575m
08/55085CONDITIONAL19 Dec 2008

permission for change of 9 no. houses consisting of 3 no. 4 bed house types "E", 4 no. 4 bed house types "D" and 2 no. 5 bed house types "L" previously permitted under Phase 3 plan file 55,035/06, to 8 no. houses consisting of 2 no. 4 bed new house type "E", 4 no. 4 bed new house type "D" and 2 no. 3 bed new house type "H1" and associated site works

Castlepark Residential Development St. Josephs Road Mallow Co. Cork.

622m
24/5131INCOMPLETED APPLICATION17 Jun 2024

Permission for Retention of a temporary portacabin including holding tank, which was retained on site used for staff welfare after the construction period, and Permission for the demolition of this existing portacabin and construction of a new pre-fabricated portacabin, including holding tank for use as staff welfare and all associated site development works.

ESB 110 kV Substation St. Josephs Road Carrigoon Beg Mallow, Co.Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?