← Back to search

Shandrum Charleville

WITHDRAWN

Planning application 08/7729

Cork - Cork County Council

Proposed Development

Subdivision of existing site, construction of dwellinghouse and wastewater treatment unit and installation of wastewater treatment unit to serve existing dwelling

View the full application file on the council's planning portal →

Application Details

Location
Shandrum Charleville
Applicant
N/A
Application Type
OUTLINE PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
7 July 2008
Status
WITHDRAWN
Decision
Pending

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
07/12851REFUSED5 Dec 2007

Subdivision of existing site, construction of dwellinghouse with waste water treatment unit and installation of waste water treatment unit to serve existing dwellinghouse

Shandrum Charleville

0m
18/7240INCOMPLETED APPLICATION10 Dec 2018

Retention of partial demolition of existing dwelling house, Retention and completion of extension under construction, Retention of demolition of shed, Retention of removal of roadside boundary ditch and Retention of hardcore to dwelling. Permission to construct a new porch to eastern gable, install a new wastewater treatment system and polishing filter, a new vehicular entrance, reinstate roadside boundary and alterations to existing dwelling house to including 2 no. windows and 1 no. patio door to western gable, removal of porch and replace with new window, realign existing windows to southern elevation and raise height of first floor perimeter walls.

Shandrum Charleville Co. Cork

0m
19/4075CONDITIONAL18 Jan 2019

Retention of partial demolition of existing dwellinghouse, Retention and completion of extension under construction, Retention of demolition of shed, retention of removal of roadside boundary ditch and Retention of hardcore to dwelling. Permission to construct a new porch to eastern gable, install a new wastewater treatment system and polishing filter, a new vehicular entrance, reinstate roadside boundary and alterations to existing dwelling house to include 2 no. windows and 1 no. patio door to western gable, removal of porch and replace with new window, realign existing windows to southern elevations and first floor extension with raised walls and new roof to dwelling.

Shandrum Charleville Co. Cork

0m
25/4441Conditional Permission13 Mar 2025

Permission for retention of detached domestic garage/store base as constructed and permission for completion of detached domestic garage/store

Shandrum Charleville Co.Cork

39m
03/3170REFUSED27 Jun 2003

Dwellinghouse

SHANDRUM, SHANDRUM,

136m
23/4810INCOMPLETED APPLICATION25 Apr 2023

Permission of retention of (a) Septic tank as constructed in its current location, (B) Garage (domestic use) at side of existing dwelling house, (C) Existing entrance and front boundary walls as constructed.

Glengarriff Newtownshandrum Charleville Co. Cork

136m
23/5817CONDITIONAL7 Sept 2023

Permission to install waste water treatment system & percolation area, and retention of a) garage (domestic use) at side of existing dwelling house and b) existing entrance and front boundary wall as constructed.

Glengarriff Newtownshandrum Charleville Co Cork

253m
19/5692WITHDRAWN3 Jul 2019

Creating an agricultural entrance from the main road

Shandrum Charleville Co. Cork

335m
18/5708INCOMPLETED APPLICATION2 Jul 2018

Retention of dwelling house as constructed under planning reg. No. 04/5605, retention of garage as constructed, retention of changes to site layout including the orientation of the dwelling and location of treatment unit and percolation area.

Shandrum Charleville Co. Cork

335m
18/6780CONDITIONAL19 Oct 2018

Retention of dwelling house as constructed (change of design, orientation and layout from that permitted under Pl. Reg. No. 04/5605) retention of garage, treatment unit and percolation area as constructed.

Shandrum Charleville Co. Cork

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?