Killacloyne Substation Terry's-Land Carrigtwohill
INCOMPLETED APPLICATIONPlanning application 08/8131
Cork - Cork County Council
Proposed Development
Continuation of use of 36m high telecommunications support structure carrying 9 no. antennae and 4 no. link dishes together with ground mounted equipment cabinets and palisade fence and erection of 12 no. additional antennae and 9 no. additional link dishes to existing structure
Application Details
- Location
- Killacloyne Substation Terry's-Land Carrigtwohill
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 29 July 2008
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Continuance of use of an existing 36m high telecommunications support structure carrying dishes and antennae with all associated works within a 2.4m high palisade compound and permission for additional antennae and dishes to allow for future third party co-location
Killacloyne 38kV substations Terry's-Land Carrigtohill
Continuation of use of existing 36m high telecommunications support structure carrying 9 no. antennae and 4 no. link dishes enclosed in a palisade fence and erection of 12 no. additional antennae and 9 no. additional link dishes to existing structure
Killacloyne Substation Terry's-Land Carrigtwohill
Alterations to existing station comprising of the retirement of 1 no. existing lattice steel 38kV tower and replacement of same with 1 no. 38kV cable chair, construction of extension to existing control building and replacement of internal station fence and gates, installation of 1 no. 38kV to MV power transformer and 3 no. 38kV control bays on existing 38kV plinth, construction of 1 no. MV plinth comprising of 1 no. transformer bay and 3 no. line bays, construction of bunding for all transformers with 1 no. associated oil interceptor, new gravel access road, extension of 38kV and MV cable ducts and associated site works
Terry's-Land Carrigtohill
Alterations to dwelling (previously permitted under planning ref.no. 06/13807) to include alterations to front elevation, reduction of roof pitch & omission of third floor
10 Chestnut Crescent Castlelake Terrysland Carrigtohill
Alterations to dwelling under construction (previous reg. no. 06/13807) to include alterations to front elevation, reduction of roof pitch, omission of 3rd floor of dwelling, extension of duration of permission granted under planning reg no. 08/9935
Site No. 10, Chestnut Cresent Castlelake Terry's-land Carrigtohill, Co.Cork
Alterations to dwellinghouse under construction (previously permitted under Pl. Reg. No. 06/13807) to include alterations to front elevation, reduction of roof pitch and omission of third floor
10 Chestnut Crescent Castlelake Terry's-land Carrigtohill
Alterations to dwelling under construction (previous reg. no. 06/13807) to include alterations to front elevation, reduction of main roof pitch, to increase height of side dormer annex to full two storey height (to match main roof) to delete rear L projection and to increase width of gable end to main dwelling, extension of duration of permission granted under planning reg, no. 08/9951
Site No. 11, Chestnut Cresent Castlelake, Terry's-land Carrigtohill, Co Cork
Residential development of 4 no. dwellinghouses with detached garages
Chestnut Cresent Castlelake Terrysland Carrigtohill
Alterations to dwelling under construction (previous Pl. Reg. No. 06/13807) to include alterations to front elevation, reduction of main roof pitch, increase height of side dormer annex to full two-storey height (to match main roof), to delete rear L- projection and to increase width of gable end to main dwelling
Site No.11, Chestnut Crescent Castlelake Terry's-land Carrigtohill
3 no. alternate house types with detached garages on each of 14 no. serviced sites
Terry's Land Carrigtwohill
The submission window has closed
Observations on this application closed on Monday 1 September 2008, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?