Baltimore Tullagh Carbery West Co. Cork
CONDITIONALPlanning application 09/117
Cork - Cork County Council
Proposed Development
Attchment of 1no. 3.5m support pole to hold 1no. 3.1m antenna to an existing eircom building. The 1no. proposed antenna is for use by the Emergency Services (Garda, Ambulance and Fire Brigade) for a new National Digital Radio Service
Application Timeline
Application received
10 Feb 2009
Decision: CONDITIONAL
12 May 2009
Decision due
14 May 2009
Grant issued
18 Jun 2009
Application Details
- Location
- Baltimore Tullagh Carbery West Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 10 February 2009
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 12 May 2009
- Grant Date
- 18 June 2009
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Attachment of 1no. 3.5m support pole to hold 1no. 3.1m antenna to existing eircom building and proposed antenna is for use by Emergency Services (Garda, Ambulance and Fire Brigade) for new National Digital Radio Service
Baltimore Tullagh Carbery West
Erect a 15m high telecommunications monopole together with antennas, dishes, and associated telecommunications equipment, all enclosed by security fencing and remove an existing 7m high wooden pole
Eir exchange Cliff Estate Baltimore Co. Cork
The retention of an existing 3.5m high support pole, with 1 no. 2.8m high radio aerial (this extends above the height of the pole to a total height of 10.4m AGL) for use by the Emergency Services (Garda, Ambulance, Fire Brigade) together with associated equipment for the National Digital Radio Service
Eircom Baltimore Baltimore Coi. Cork
Construction of extension to dwelling
No.16 New Road Baltimore
Replacement at front of existing dwelling of 3no. velux rooflights at first floor level with dormer windows to sittingroom at ground floor level with glazed screen, new flue from stove and construction of new dormer bathroom at first floor level to rear of bedroom no.1
New Road Baltimore
Replace at front of dwelling 3no. rooflights at 1st floor level with dormer windows and 2no. windows at ground floor level sittingroom with glazed screen, single storey extension to rear to accomodate utility room and bedroom and construction of new dormer to rear of existing bedroom no.1 to accommodate bathroom ensuite and replace existing concrete tiles to roof with natural slate
New Road Baltimore
Replace at front of existing dwelling 3no. velux rooflights at first floor level with dormer windows and 2no. windows to sittingroom at ground floor with glazed screen; single storey extension to rear to accommodate utility room and bedroom; construction of new dormer to rear of bedroom no1. to accommodate bathroom en-suite and replace existing concrete tiles to roof with natural slate
New Road Baltimore
Construction of conservatory extension to dwelling
THE HILL, THE HILL, BALTIMORE,
Dwellinghouse
SITE NO. 15, NEW BYPASS RD., BALTIMORE,
Permission for Retention of domestic, below ground outdoor swimming pool
Clearwater New Road Baltimore Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?