Proposed Development
Erection of a permanent 80m high wind monitoring mast, together with underground cabling and associated site works
Application Timeline
Application received
17 Feb 2009
Decision due
7 Jun 2009
Decision: CONDITIONAL
8 Jun 2009
Grant issued
9 Jul 2009
Application Details
- Location
- Carrigduff Millstreet
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 17 February 2009Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 8 June 2009
- Grant Date
- 9 July 2009
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Alterations to locations of 4 no. wind turbines(permitted under 01/1248) and increase in hub height from 65m to 80m and construction of on site tracks and associated works
Carrigduff Millstreet
Alteration to the locations of 4no. wind turbines and an increase in their hub height from 65m to 80m, construction of on-site tracks & associated works
Boggeragh Wind Farm Carrigduff Millstreet
An extension to the existing 110K electricity subststion. The proposed work will involve the construction of new palisade fencing, bunded concrete plinth, power filter cabinet, transformer and access track including all associated site works
Crinnaloo South Millstreet Co. Cork
Permission for the construction of an extension to the existing 110kv electricity substation and Retention of existing development. The proposed works for which Permission is sought will involve the construction of new palisade fencing, bunded concrete plinth, power filter cabinet, transformer, access track and all associated site works. The development for which Retention is sought constitutes ground levelling, 2 no. storage containers, minor re-location of control building and security fence, access road, drainage and all associated works
Crinnaloo South Millstreet Co. Cork
Construction of an extension to existing 110kv electricity substation. The proposed works for which planning permission is sought will involve the construction of new palisade fencing, bunded concrete plinths, 4no. battery storage units, transformers, control cabin, access track and all associated site works.
Crinnaloo South Millstreet Co Cork
Extend and alter existing 110 kv sub station compound to include extension to existing site boundary with new palisade fencing, new 38kv control building with ancillary plant and equipment and associated site works
Crinnaloo South Millstreet
Development of an access track for the construction and operation of the already permitted extension to the existing substation (planning Ref.No. 12/5834) and associated site works
Crinnaloo South Millstreet Co.Cork
Retention & completion of relocated substation compound, control buildings & alterations to the substation compound boundaries for which planning permission was granted under planning ref.no's 05/2490 & 01/1248 in the Boggeragh Mountains Wind Farm. Changes consist of an increase to the overall area of the compound from the permitted 65m X 61m to 65.2m X 77.5m, the addition of extra switchyard gear & associated cabling & ducting, 2no. control houses, new road layout within compound, waste treatment unit & soak pit, and associated site works
Crinnaloo South Millstreet
Alterations to the permitted 110kV Boggeragh Mountains Wind Farm substation compound (planning ref.no. 01/1248 & 05/2490). Changes will consist of an increase in the overall area of the compound, the addition of extra switchyard gear & associated cabling & ducting, 2no. control houses, new road layout within compound, septic tank & soakpit & associated site works
Crinnaloo South Millstreet
Extending and altering the existing 110kv sub station compound to include extension to the existing site boundary with new palisade fencing, steel storage container, statcom control unit and ancillary plant and equipment, including all associated site works
Crinnaloo South Millstreet Co Cork