← Back to search

Maulbaun Passage West

CONDITIONAL

Planning application 09/5912

Cork - Cork County Council

Proposed Development

Construction of a 16 classroom generic repeat design primary school complete with playing areas, car parking, temporary waste water treatment plant & associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 Jun 2009

  2. Decision: CONDITIONAL

    9 Nov 2009

  3. Decision due

    10 Nov 2009

  4. Grant issued

    10 Dec 2009

Application Details

Location
Maulbaun Passage West
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
11 June 2009
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
9 November 2009
Grant Date
10 December 2009

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

77m
12/5148CONDITIONAL29 May 2012

Construction of an enclosed synthetic all-weather playing pitch (by 3m high mesh panels) with floodlighting consisting of 4no. 10m high masts with a light intensity of 300 Lux average at pitch level, with 2.4m high palisade perimeter fencing to encompass entire playing sites along with toilet & store block, revised entrance and associated site works

Maulbaun Passage West Co.Cork

126m
03/5967CONDITIONAL25 Nov 2003

Construction of a canopy roof with 3 no. supporting pillars and a bay window to the front of dwelling

12 Maulbaun Passage West

130m
10/5786CONDITIONAL16 Jul 2010

Reconstruction of school's front north western boundary fencing, opposite Barr an Bhaile Estate, with new boundary piers, railings and gates measuring 2.7m to 3.2m over ground level, incorporating 2 no. pedestrian entrances and 1 no. vehicle entrance and returning for a distance of 14m along the south western boundary adjoining the sports ground, the addition of palisade fencing to the north eastern boundary adjoining Parkview Estate and to the south eastern boundary adjoining Mariner's View Estate, measuring 2.4 to 2.6m over ground level, associated works including footpath reconfiguration and resurfacing at entrance gates

Maulbaun Passage West

140m
09/4740CONDITIONAL10 Mar 2009

Single storey extension to rear & front of existing dwelling & demolition of existing rear w.c.

No.6 Barr an Bhaile Maulbaun Passage West

140m
08/10357INCOMPLETED APPLICATION23 Dec 2008

Construction of single storey extension to rear and front of dwellinghouse and demolition of existing rear w.c. accommodation

No. 6 Barr an Bhaile Maulbaun Passage West

141m
23/4624CONDITIONAL3 Apr 2023

Construct a single storey extension to front of dwelling house, new sliding door to existing porch and all associated site works.

8 Barr an Bhaile Maulbaun Passage West Co. Cork

174m
06/4722CONDITIONAL13 Feb 2006

Alterations and extension to dwelling

No.12, Barr an Bhaile Maulbaun Church Hill Passage West

220m
05/8590CONDITIONAL22 Nov 2005

Alterations to include bay windows,attic conversion,first floor windows and 7 no. velux windows to dwelling

No.20 Park View,Maulbawn Passage West

220m
05/7508INCOMPLETED APPLICATION13 Oct 2005

Conversion of attic and alterations to dwelling

No.20, Park View Passage West

221m
07/9487CONDITIONAL11 Jul 2007

Construction of extension to front of dwelling including new bay window, minor alterations including additional patio door and window to side elevation and 3 no. velux roof lights to North West elevation

No. 19 Parkview Maulbaun Passage West

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?