← Back to search

Baneshane Midleton

WITHDRAWN

Planning application 09/5973

Cork - Cork County Council

Proposed Development

Construction of 3no. office based industry buildings with total floor areas of 5021sqm ranging from three to five storeys in height, single light industrial building with total floor area of 2296sqm divided internally into 10no. separate units with first floor office area, 2no. bin stores to service office based industry buildings, revisions to the foul & surface water drainage & watermains layouts permitted under file no. 06/8157 to include the addition of a surface water attenuation tank, and all site development/enabling works & ancillary site services

View the full application file on the council's planning portal →

Application Details

Location
Baneshane Midleton
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
17 June 2009
Status
WITHDRAWN
Decision
Pending

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

107m
15/6969CONDITIONAL23 Dec 2015

A residential development comprising the construction of 70 no. dwelling houses and all associated ancillary development works including access, parking, footpaths, drainage (including the provision of a pumping station), landscaping and amenity areas (the proposed residential development will replace 74 no residential units previously permitted under 06/8157 and extended under 12/4853).

'Abbey Wood' Baneshane Midleton Co. Cork

107m
21/5676REFUSED17 Jun 2021

A residential development comprising the construction of 70 no. dwelling houses and all associated ancillary development works including access, parking, footpaths, drainage (including the provision of a pumping station), landscaping and amenity areas (the proposed residential development will replace 74 no residential units previously permitted under 06/8157 and extended under 12/4853). - Extension of duration of permission granted under planning reference: 15/6969 - An Bord Pleanála reference: PL04.247875

'Abbey Wood' Baneshane Midleton Co. Cork

137m
19/4806WITHDRAWN2 Apr 2019

Construction of a two storey dwelling, waste water treatment system and ancillary site works

Baneshane Midleton Co. Cork

137m
19/4449INCOMPLETED APPLICATION25 Feb 2019

Construction of a two storey dwelling, waste water treatment system and ancillary site works

Baneshane Midleton Co. Cork

145m
09/5277CONDITIONAL23 Apr 2009

Change of house types consisting of 3no. four-bed house types 'F', 4no. four-bed house types 'F2', 2no. four-bed house types 'F3' (9no. in total), previously permitted on part of the overall site for which a residential development was granted under planning ref.no. 06/8157, and 2no. four-bed house types 'F', 3no. four-bed house types 'F2' & 1no. four-bed house type 'F3' (6no. in total), perviously permitted as a change of house type under planning ref.no. 07/11012 to 11no. four-bed new detached house type 'H', minor alterations to existing road network, and associated site works and services

Baneshane Midleton

150m
19/5242CONDITIONAL17 May 2019

The construction of 6 no. semi-detached dwelling houses and all associated ancillary development works including access roads, parking footpaths, drainage and landscaping. The proposed dwelling units will replace 3 no. detached units previously permitted under Planning Ref: 16/4331

Baneshane Midleton Co. Cork

172m
06/8157CONDITIONAL16 Jun 2006

Demolition of dwelling and existing farm buildings and construction of 435 no. dwellinghouses comprising of 200 no. four bed units, 99 no. three bed units, 114 no. two bed units and 22 no. one bed units, creche with out door play area, 2 no. tennis courts/hard surface play areas, football pitch, all weather pitch, Nionra pre school facility, gaelscoil primary school, site developments works, access provisions including integrating with public road, associated road realignments, upgrading and permitted roundabout, pedestrian crossings, bus pull-ins, boundary walls, surface car parking, landscaping , public lighting and infrastructure/services provisions

Baneshane Midleton

172m
12/4853UNCONDITIONAL24 Apr 2012

Completion of demolition of dwelling and existing farm buildings and construction of 403 no. dwellinghouses comprising of 203 no. four bed units, 86 no. three bed units, 96 no. two bed units and 18 no. one bed units, creche with out door play area, 2 no. tennis courts/hard surface play areas, football pitch, all weather pitch, Nionra pre school facility, gaelscoil primary school, site developments works, access provisions including integrating with public road, associated road realignments, upgrading and permitted roundabout, pedestrian crossings, bus pull-ins, boundary walls, surface car parking, landscaping , public lighting and infrastructure/services provisions - Extension of duration of permission granted under Planning Reg. No. 06/8157

Baneshane Midleton Co. Cork

178m
03/6649CONDITIONAL19 Dec 2003

Dwelling

Baneshane Midleton

182m
09/5951CONDITIONAL15 Jun 2009

Retention of 28.8sq.m, 6m high temporary advertising sign located on lands adjacent to N25 west bound carriageway. The time period sought for the temporary use of the sign is to be consistent with the duration of the permission 06/8157(the sign is an advertising and directional sign for the Abbeywood housing development which is under construction as per permission 06/8157 as modified)

Baneshane Midleton

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?