The Lidl Regional Distribution Centre Pike Cross Ballyhay Charleville
CONDITIONALPlanning application 09/7310
Cork - Cork County Council
Proposed Development
Construction of first floor office storey over the existing offices , and the upgrading & replacing of the existing sewage treatment plant from a 75 person capacity tank to a 150 person capacity tank
Application Timeline
Application received
13 Oct 2009
Decision: CONDITIONAL
3 Dec 2009
Decision due
7 Dec 2009
Grant issued
13 Jan 2010
Application Details
- Location
- The Lidl Regional Distribution Centre Pike Cross Ballyhay Charleville
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 13 October 2009
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 3 December 2009
- Grant Date
- 13 January 2010
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of first floor office extension over existing ground floor office storey, and upgrading/replacing of existing wastewater treatment plant from a 75 person to 150 person capacity
The Lidl Regional Distribution Centre Pike Cross Ballyhay Charleville
Development to modernise and extend internal office and staff facilities (totaling 218.12sq.m), at a site of 7.692ha, all contained within the building footprint of the existing permitted warehouse development. The proposed development consists of: a) The modernisation and extension of the existing Goods In Office area comprising: -The internal reconfiguration of existing ground floor staff welfare facility block; - The construction of a first floor mezzanine office extension (132.17sq.m) to existing office space to accommodate expended open plan office space and an office; - The provision of new roof plant, incl. condenser units; and -The provision of 3 no. new windows to east elevation of existing permitted warehouse. b) The extension of the existing Transport and Goods Out Offices area comprising: - The replacement of the existing ground floor Transport Office with a new enlarged Ground Floor Transport Office (36.66.sqm); - The construction of a new first floor Goods Out Office (37.43sq.m) to accommodate an office and a meeting room above the existing ground floor staff welfare facility block; - The construction of a new access staircase and first floor walkway (11.86sq.m) to new first floor Goods Out Office; - The provision of new roof plant, incl. condenser units; - The provision of 1 no. new window to west elevation of existing permitted warehouse. c) All associated site development works above and below ground level. Primary vehicular and pedestrian access to the development will be maintained from the existing site entrance from Local Road L1322.
Lidl Regional Distribution Centre Ballyhay Charleville Co. Cork
Construction of regional distribution warehouse, two storey office block, track marshalling and car park areas and associated works
BALLYHAY, BALLYHAY,
New two storey regional distribution warehouse with the plantroom facilities at first floor level with a single storey office block, overall building height 14.92m, total building foor area 29,893 sq. m. with associated ancillary site services (including the installation of a rising sewer main to the Cork County Council sewerage system in Charleville or alternatively a waste water treatment system on site for discharge of treated water into storm water line, and the construction of a storm water line from the site to the Awbeg River) and the realignment of the N20 and L1324 roads to facilitate same, with truck marshalling and carparking areas.
Pike Cross Ardnageehy Ballyhea
Development to modernise and extend internal office and staff facilities (totaling 218.12 sq m), all contained within the building footprint of the existing permitted warehouse development. The proposed development consists of: 1. The modernisation and extension of the existing transport and goods out office at the site area of 389 sq m - Ground floor extension of 36.66 sq m for an office; - First floor extension of 37.43 sq m to accommodate an office and a meeting room; - Access staircase and first floor walking of 11.86 sq m - New roof plant, incl. condenser units; and - 1no. new window to west elevation of existing permitted warehouse 2. The modernisation and extension of the existing goods in office at the site area of 477 sq m - First floor extension of 132.17sq m to accommodate 3no offices; - Access staircase; - New roof plant, incl condenser units; and - 3 no. new windows to east elevation of existing permitted warehouse 3. All associated site works above and below ground level. Primary vehicular and pedestrian access to the development will be maintained from the existing site entrance from local road L1322
Lidl Regional Distribution Centre Ballyhay Charleville Co. Cork
Retention of modifications to front elevation and access arrangement at existing regional distribution centre which were made as part of the construction of an extension to an existing facility which was previously granted permission under Planning Reg. No. 09/7310
Pike's Cross Ballyhay Charleville
Extension to warehouse (circa 2,113 square metres), 2 no. pallet compounds (circa 1,709 square metres), modifications to existing refuse collection area and associated works
Lidl Regional Distribution Centre Ballyhay Charleville
Construction of extension to an existing dwelling, construction of a new relocated site entrance to replace existing entrance, construction of a new roadside boundary wall with railings and replacement of the existing septic tank with a proprietary treatment unit
Ballyhay Ballyhea Charleville Co.Cork
Construction of an extension and external porch and carrying out alterations to an existing dwelling, construction of new relocated site entrance to replace existing entrance, construction of new roadside boundary wall with railings and replacement of existing septic tank with a proprietary treatment unit.
Ballyhay Td. Ballyhea Charleville Co. Cork
Construction of an extension and external porch and alterations to existing dwelling, construction of a new relocated site entrance to replace existing entrance, construction of a new roadside boundary wall with railings and replacement of the existing septic tank with proprietary treatment unit
Ballyhay Td Ballyhea Charleville Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?