← Back to search

Boycestown Carrigaline

CONDITIONAL

Planning application 09/7913

Cork - Cork County Council

Proposed Development

Dwelling, garage and septic tank

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    15 Dec 2009

  2. Decision due

    26 May 2010

  3. Decision: CONDITIONAL

    26 May 2010

  4. Grant issued

    28 Jun 2010

Application Details

Location
Boycestown Carrigaline
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
15 December 2009Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
26 May 2010
Grant Date
28 June 2010

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

227m
05/4513REFUSED27 Jun 2005

Dormer type dwelling

Boycestown Fountainstown

234m
08/8726CONDITIONAL3 Sept 2008

Dwelling and wastewater treatment unit

Boycestown Carrigaline

283m
17/4504CONDITIONAL3 Mar 2017

Construction of a detached dwellinghouse, new vehicular entrance, detached garage and all associated site works

Boycestown Carrigaline Co. Cork

348m
20/5410CONDITIONAL7 Jul 2020

Retention of the following: (a) Change of use from permitted single storey domestic garage permitted under Planning Ref. 17/05689 to two storey dormer granny flat connected to main dwelling. (b) Permission for retention for construction of a single storey link extension, (c) permission for retention for alterations to front site boundary walls, entrance walls and gates (d) retention for single storey domestic garage (e) retention of driveway and all associated site works.

Boycestown Carrigaline Co. Cork

348m
20/5220INCOMPLETED APPLICATION16 Jun 2020

Permission for retention for the following : (a) change of use from permitted single storey domestic garage permitted under Planning Ref 17/05689 to two storey dormer granny flat connected to main dwelling, (b) permission for retention for construction of a single storey link extension, (c) permission for retention for alteration to front site boundary walls, entrance walls and gates, (d) retention for single storey domestic garage and all associated site works.

Boycestown Carrigaline Co. Cork

348m
17/5517INCOMPLETED APPLICATION16 Jun 2017

Permission for the following: (A) The refurbishment of an existing single storey cottage, (B) Permission for a single storey link extension to a proposed two storey dormer extension to the rear, (C) A proposed single storey detached garage, (D) A proposed bioprocess sewage treatment plant and raised polishing filter percolation area, (E) Relocation of existing site entrance, (F) All associated site works.

Boycestown Carrigaline Co.Cork

348m
17/5689CONDITIONAL4 Jul 2017

(A) The refurbishment of an existing single storey cottage including alterations to existing elevations, (B) Permission for a single storey link extension to a proposed two storey dormer extension to the rear. (C) A proposed single storey detached garage, (D) A proposed bioprocess sewage treatment plant and raised polishing filter percolation area, (E) relocation of existing site entrance, (F) all associated site works.

Boycestown Carrigaline Co. Cork

399m
17/4297CONDITIONAL13 Feb 2017

Construction of agricultural building to include slatted livestock housing, livestock crush, easi-feed and slatted slurry tank along with associated site works.

Boycestown Carrigaline Co. Cork

400m
17/7003CONDITIONAL20 Nov 2017

A. Construction of extension to south western elevation of existing potato-packing warehouse unit, B. Construction of potato washing settling tank and collection tank along with associated site work

Boycestown Carrigaline Co. Cork

407m
07/5513CONDITIONAL28 Feb 2007

Alterations to include raising of ridge height to provide first floor living accommodation and construction of ground floor extensions to dwelling

Frenchfurze Carrigaline

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?