Proposed Development
Development consisting of of a 3 storey Primary Care Centre to include
- (a)GP Medical facility with ancillary offices, toilets, staff areas & stores
- (b)HSE Medical facility including Adult Mental Health Sector Headquarters, Primary Care Community services, Mental Health Day Centre & Out Of Hours treatment Centre with ancillary offices, toilets, staff areas & stores etc., (c) 4no. lettable medical support units on ground floor, (d) 4no. bookable rooms , (e) UCC Continued Medical Education Centre , (f) shared facilities including public waiting room & toilets, plant & electrical rooms, refuse/dry/clinical waste room, stores, common room/kitchen, conference/multi-purpose room, clean & dirty utilities etc., (g) site access road with junctions at Ticknock Hill & Tay Roads complete with public street lighting, (h) temporary signage at the Tiknock Hill entrance, (i) new on site foul treatment plant with connection to the public sewer, surface water drainage to include on site surface water attenuation system & connection to public water mains at Tiknock Hill & (J) all site development/enabling works & services
Application Timeline
Application received
11 Dec 2009
Decision: REFUSED
11 Feb 2010
Decision due
13 Feb 2010
Application Details
- Location
- Tiknock Cobh
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 11 December 2009
- Status
- APPLICATION FINALISED
- Decision
- REFUSED
- Decision Date
- 11 February 2010
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The development consists of: A 65sq.m extension to the rear of the existing filling station shop building to accommodate back of house facilities (storage, toilets). Reconfiguration of the existing internal shop layout to provide for a retail area (63sq.m net floor area); 1 no. food offer (26sq.m) and seating area (20sq.m). Reduction in size of existing canopy over the fuel pumps (rear portion). Removal of faux slate cladding on the canopy and over the shop, along with new branding to 4 sides of canopy. Changes to the front elevation including new window openings, new door, increased size of existing window and new signage. Replacement of main ID sign at front of the site (6.5m high). All associated site works including new brush wash, lined car parking, and new proprietary treatment foul treatment system with raised bed percolation area.
Applegreen Filling Station Tiknock Cobh Co. Cork
Permission for retention of a portable waste compactor and portable recyclables container
Applegreen Service Station Tiknock Cobh
1) Partial demolition works to the existing service station building and ancillary site features; 2) Extension (16.3sqm), change of use (88.5sqm) and alterations to the existing service station building to provide office space, sluice room, corridor, lobby, toilets, store rooms, retail floor (82sqm) with wine sales, and takeaway facility complete with drive-thru. 3) Construction of ancillary site features such as signage, boundary treatments, landscaping and car parking and all associated site works
Tiknock Cobh Co.Cork
Permission to install a new waste water treatment unit and percolation area to serve existing dwelling house.
The Glebe, Tay Road, Carrignafoy, Cobh, Cork, P24F683
The construction of a single storey extension to the northern elevation for use as retail floorspace, a bakery (accessed internally) and a new entrance/exit lobby, a single storey extension to the eastern elevation for use as a retail floorspace, toilet and a meeting room. The proposed extension is 535sq.m gross floor area (404sq.m net retail area) bringing the store to 1,815sq.m gross floor area (1,254sq.m net retail area). The proposed development will also include revisions to the existing car parking, bicycle stands, revised signage, advertising, additional landscaping and all site development and ancillary works. The proposed development also consists of the Retention of an externally illuminated double-sided sign
Aldi Dean and Chapter Land of Cloyne Ticknock, Cobh Co. Cork
Construction of single storey dwelling, installation of aeration treatment unit and construction of entrance to serve proposed and existing dwelling
Tay Road Carrignafoy Cobh
Dormer bungalow with waste water treatment unit and associated site works
Tay Road Carrignafoy & Ballynacrusha Cobh Co. Cork
Dwelling,aeration treatment unit, and associated site works
Tay Road Carrignafoy & Ballynacrusha Cobh
Retention of domestic garage
Tiknock Cobh
Alterations and first floor extension on stilts to rear of existing two storey dwellinghouse and associated site works
The Glebe Tay Road Ballyvoloon Cobh
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?