Baltimore RNLI Lifeboat Station, Bull Point, Baltimore, Co. Cork

INCOMPLETED APPLICATION

Planning application 10/41

Cork - Cork County Council

Proposed Development

To extend and refurbish the existing Lifeboat Station to accommodate new Atlantic 85 Inshore Lifeboat, and construction of a new afloat berth/pontoon to accommodate new Tamar Class All Weather Boat

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    26 Jan 2010

  2. Decision due

    22 Mar 2010

Application Details

Location
Baltimore RNLI Lifeboat Station, Bull Point, Baltimore, Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
26 January 2010
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
22 March 2010

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
10/104WITHDRAWN18 Feb 2010

To extend and refurbish the existing lifeboat station, construct a detached store, construct a new afloat berth & pontoon, install a new (small scale) waste treatment plant, construct an additional parking area with retaining structure & associated landscaping.

Baltimore, RNLI Lifeboat Station, Bull Point, Baltimore, Co. Cork

0m
10/91INCOMPLETED APPLICATION15 Feb 2010

To extend and refurbish the existing lifeboat station, construct a detached store, construct a new afloat berth & pontoon, install a new (small scale) waste treatment plant, construct an additional parking area with retaining structure & associated landscaping.

RNLI Lifeboat Station, Bull Point, Baltimore, Co. Cork

11m
11/544CONDITIONAL5 Sept 2011

To extend and refurbish the existing lifeboat station building, small extension of the existing slipway, construct a detached store, construct a new afloat berth (including a quay wall, pontoon, and breakwater), install a new (small scale) waste treatment plant, including discharge of effluent into the sea, construct additional parking area with associated hard and soft landscaping and new palisade fencing. An Environmental Appraisal has been prepared in respect of the afloat berth construction.

Baltimore RNLI Lifeboat Station Bull Point Baltimore Co. Cork

11m
11/385INCOMPLETED APPLICATION28 Jun 2011

To extend and refurbish the existing lifeboat station building, small extension of the existing slipway, construct a detached store, construct a new afloat berth (including a quay wall, pontoon, and breakwater), install a new (small scale) waste treatment plant, including discharge of effluent into the sea, construct additional parking area with associated hard and soft landscaping. An Environmental Appraisal has been prepared in respect of the afloat berth construction.

Baltimore RNLI Lifeboat Station Bull Point Baltimore Co. Cork

12m
11/442INCOMPLETED APPLICATION20 Jul 2011

To extend and refurbish the existing lifeboat station building, small extension of the existing slipway, construct a detached store, construct a new afloat berth (including a quay wall, pontoon, and breakwater), install a new (small scale) waste treatment plant, including discharge of effluent into the sea, construct additional parking area with associated hard and soft landscaping and new palisade fencing. An Environmental Appraisal has been prepared in respect of the afloat berth construction.

Bull Point Baltimore Co. Cork

87m
13/390CONDITIONAL5 Jul 2013

Removal of previously dredged and stockpiled surplus rock material (circa 5,000m³) from the approved lifeboat berth and breakwater (as permitted under planning reference 11/544) and the variation of Planning Condition 5 (waste management plan), the variation of Planning Condition 11 (solid waste recycling) and the variation of Planning Condition 13 (hazardous/contaminated waste recycled) of the approved permission permitted under planning reference 11/544 that would allow for the use of all such surplus rock material for the re-profiling and re-grading of the lands, the importation of top soil, and all associated landscaping, grass seeding/planting

Failte Ireland land to the south-east of Baltimore Bull Point, Baltimore Co. Cork

87m
13/381INCOMPLETED APPLICATION1 Jul 2013

Removal of previously dredged and stockpiled surplus rock material (circa 5,000m³) from the approved lifeboat berth and breakwater (as permitted under planning reference 11/544) and the variation of Planning Condition 5 (waste management plan), the variation of Planning Condition 11 (solid waste recycling) and the variation of Planning Condition 13 (hazardous/contaminated waste recycled) of the approved permission permitted under planning reference 11/544 that would allow for the use of all such surplus rock material for the re-profiling and re-grading of the lands, the importation of top soil, and all associated landscaping, grass seeding/planting

Failte Ireland Land to South East of Baltimore RNLI Lifeboat Station Bull Point Baltimore, Co. Cork

146m
08/792INCOMPLETED APPLICATION30 Apr 2008

Alterations to building permitted by ref: 02/883 (under construction) and alterations to include elevational changes (including addition of third floor terraces), interanl modifications to layout (including provisions of elevators), 115m² extension at ground floor level and all associated site development works

Church Strand Baltimore

146m
08/1747INCOMPLETED APPLICATION25 Sept 2008

Alterations to building permitted under ref: 02/0883 (under construction) and proposed alterations include elevational changes (including addtition of third floor terraces), internal modifications to layout (including provision of elevators), 115m² extension at ground floor level and all associated site works

Church Strand Baltimore

146m
08/1786CONDITIONAL3 Oct 2008

Alterations to building permitted under ref: 02/0883 (under construction) and proposed alterations include elevational changes (including addtition of third floor terraces), internal modifications to layout (including provision of elevators), 115m² extension at ground floor level and all associated site development works

Church Strand Baltimore

The submission window has closed

Observations on this application closed on Monday 1 March 2010, five weeks after it was received. The authority cannot accept a late submission.