Pobal Cholaiste Comm. College Carrignafoy Cobh Co. Cork

CONDITIONAL

Planning application 10/52010

Cork - Cork County Council

Proposed Development

Upgrading of pitch floodlighting to the all-weather pitch to an average of 300 lux at pitch level consisting of 4 No. 15m high masts, alterations to the all weather pitch perimeter fencing along with a compound to contain 2 No. steel containers with pallisade fence surround and walkway amenity lighting

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    18 May 2010

  2. Decision: CONDITIONAL

    5 Aug 2010

  3. Decision due

    10 Aug 2010

  4. Grant issued

    9 Sept 2010

Application Details

Location
Pobal Cholaiste Comm. College Carrignafoy Cobh Co. Cork.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
18 May 2010
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
5 August 2010
Grant Date
9 September 2010

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

20m
25/6003Grant with Conditions23 Sept 2025

Permission for 1) demolition of the existing single storey school buildings (area c.3970m2) on the site, 2) construction of an 8,982m2 part one, two ,three storey replacement 600-pupil post-primary school building and associated facilities comprising: i) 23 no. general classrooms, 6 no. specialist classrooms, 4 no. science laboratories, 3 no. technology rooms, 2no. art classrooms, 2 no. home economics classrooms, a 4 no. class base Special Education Needs unit, ii) a general purpose/dining area, multi-use PE hall, library, administration offices, staff room, pupil social areas, fitness suite and changing room facilities, iii) hard and soft landscaping to a central external courtyard, iv) an external play area/sensory garden adjacent to the Special Education Needs unit. v) installation of solar PV panels to the roof, 3) all other associated site works required to facilitate the proposed development including; i) the provision of 4 no. hard play court areas, ii) the retention of an existing grass playing pitch and the retention of an existing all-weather sports surface, iii) the relocation of the vehicular site entrance to the east of the existing vehicular entrance with provision of an air source heat pump enclosure adjacent to the new school entrance, iv) the provision of 58 no. car-parking spaces including 6 no. accessible spaces, car set-down facilities and 172 no. bicycle parking spaces, v) construction of a single storey bin store and ESB substation, and a separate LPG gas tank enclosure to the west of the school site, vi) upgraded perimeter/boundary landscaping and fences, 4) works in the public realm outside the school site to include relocation of existing on-street carparking spaces to the east along Carrignafoy Avenue and new connecting footpaths.

Carrignafoy Community College, Carrignafoy, Carrignafoy, Cobh, Cork, P24WR29

21m
06/52085CONDITIONAL22 Nov 2006

2.4 metre high palisade fencing around the perimeter of grass pitch and 8 No. 18 metre high columns with 3 No. 2kw light fittings on each column

Cobh Community College Cobh Co. Cork.

21m
06/52084CONDITIONAL22 Nov 2006

Erection of fencing and netting totalling 5 metres in height around perimeter of artificial pitch with 6 No. 12 Metre high columns with 2 No. 1 Kw light fittings on each column and a 2.4 metre high pallisade fence 2 metres outside artificial pitch surrounding the pitch

Carrignafoy Cobh Co. Cork.

110m
08/52008CONDITIONAL20 Mar 2008

Demolish existing garage, construct dwellinghouse and all associated site development works

No. 12, The Anchorage, Cobh, Co. Cork.

110m
22/5653CONDITIONAL14 Jul 2022

Permission to construct a new two storey extension to the western side of an existing dwelling incorporating an existing garage to the new build and construction of a new garage.

Bramalea 12 The Anchorage Carrignafoy, Cobh Co. Cork

126m
14/52006CONDITIONAL28 Feb 2014

Renovation and part conversion of existing storage building into school gymnasium and associated site works

Cobh Community College Carrignafoy Cobh Co. Cork.

126m
06/52080CONDITIONAL8 Nov 2006

Renovation and part conversion of existing storage building into school gym and associated works

Cobh Community College Carrignafoy Cobh Co. Cork.

136m
19/4340CONDITIONAL14 Feb 2019

1. Retention of ground and first floor extension to rear of dwelling. 2. Permission for first floor and second floor extension to side of dwelling.

121 The Spires Carrignafoy Cobh Co. Cork

142m
12/4117CONDITIONAL30 Jan 2012

Increase height of the existing road boundary wall, provide new pier with vehicular and pedestrian gates within existing entrance and all associated site works

122 The Spires Carrignafoy Cobh

155m
20/4203WITHDRAWN6 Feb 2020

To construct a single storey detached dwelling for use as a granny flat (ancillary to the existing main dwelling), new vehicular entrance to serve granny flat and associated site works.

Roseville Wilmount Avenue Carrignafoy Cobh, Co. Cork