← Back to search

Burren Kilbrittain Bandon

CONDITIONAL

Planning application 10/5680

Cork - Cork County Council

Proposed Development

Two-storey dwelling house, garage, associated site works and services including wastewater treatment unit

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    7 Jul 2010

  2. Decision: CONDITIONAL

    6 Oct 2010

  3. Decision due

    7 Oct 2010

  4. Grant issued

    8 Nov 2010

Application Details

Location
Burren Kilbrittain Bandon
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
7 July 2010
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
6 October 2010
Grant Date
8 November 2010

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

91m
07/6550CONDITIONAL29 Mar 2007

Construction of unroofed slurry storage tanks and ancillary concrete works

Burren Kilbrittain

345m
09/6472CONDITIONAL24 Jul 2009

Retention of detached granny flat and associated site works

Burren Kilbrittain

345m
09/6486CONDITIONAL24 Jul 2009

Reconstruction of western wing wall of existing entrance and construction of part of new access roadway to link in with existing access roadway to serve dwellinghouse and retention of existing dwellinghouse (change of plan), revised site layout, alterations to site boundaries and relocation of septic tank and percolation area to that permitted under 00/7801 and retention of existing pillars of existing entrance and retention of part of existing access roadway

Burren Kilbrittain

347m
11/4419CONDITIONAL4 Mar 2011

Construction of new vehicular entrance to serve existing dwellinghouse, demolition and removal of part of existing domestic driveway, construction of part of new domestic driveway to link in with existing domestic driveway, building up of western wing wall of existing vehicular entrance and change of use of same existing vehicular entrance to provide an agricultural access only through existing inner pillars and associated site works

Burren Timoleague

359m
20/4721CONDITIONAL8 Apr 2020

Construction of an extension to side, rear and front elevations of the existing dwelling house, including the introduction of two dormer windows to the front elevation, and associated site works.

Burren Kilbrittain Bandon, Co. Cork

359m
25/6060Grant with Conditions29 Sept 2025

Permission for retention of pergola extension to dwelling and detached lofted garage/workshop with home office and fire exit in attic and all associated site development works.

Burren, Kilbrittain, Bandon, Co. Cork. P72 K103.

370m
07/11793INCOMPLETED APPLICATION19 Oct 2007

Retention of detached granny flat

Burren Kilbrittain

370m
07/12311REFUSED12 Nov 2007

Retention of detached granny flat

Burren Kilbrittain

393m
07/11134WITHDRAWN21 Sept 2007

Dwellinghouse

Burren Kilbrittain

424m
05/1254CONDITIONAL3 Mar 2005

Retention of vehicular entrance and conservatory and permission for construction of extensions to dwellinghouse(including replacement conservatory)

Burren Kilbrittain

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?