Proposed Development
Construction of ground and first floor extension to dwellinghouse, demolition of conservatory and associated site works
Application Timeline
Application received
9 Sept 2010
Decision: CONDITIONAL
2 Nov 2010
Decision due
3 Nov 2010
Grant issued
3 Dec 2010
Application Details
- Location
- Lavally Upper Mallow
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 9 September 2010
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 2 November 2010
- Grant Date
- 3 December 2010
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The development will consist of: (1) Permission to decommission the existing wastewater treatment unit and replace with a secondary wastewater treatment system followed by a new polishing filter. (2) Permission for Retention for the following (a) Minor alterations to front elevation of existing dwelling (b) Garage as constructed (c) Revised planning boundaries (d) Entrance piers and splayed walls as constructed and (e) Alterations to previously approved landscaping plan.
Rockforest East Mallow Co. Cork P51YAA3
Dwellinghouse, detached garage and installation of waste water treatment unit
Rockforest East Rockforest West Mallow
Extension to open slurry tank
Lavally Upper Mallow
Construction of a dwelling and all associated services
Rahan Mallow
Construction of a dwellinghouse and all associated site works
Rockforest West Mallow .
Construction of a dwellinghouse and all associated site works - Extension of Duration of Permission granted under Planning Reg. No. 11/6471
Rockforest West Mallow Co. Cork
Construction of extension to dormer dwelling to include garage on ground floor and bedroom on first floor
Rahan Mallow
Retention of alterations to site boundaries and relocation of entrance to existing dwelling previously granted under Planning Ref. No. 01/6632
Rahan Mallow Co.Cork
Dwellinghouse and garage
Rockforest East Mallow
1. Permission to construct a proprietary wastewater treatment system, polishing filter and all associated site works, 2. Retention for change of use of commercial unit to domestic use ancillary to existing dwelling as constructed. 3 Retention of rear extension.
Rockforest West Mallow Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?