Proposed Development
Demolish roof over existing dwelling and to construct a new roof over same dwelling to include for attic accomodation with 1 no. first floor window and 2 no. dormer windows to the front and 6 no. rooflights to the rear.
Application Timeline
Application received
15 Feb 2011
Decision due
11 Apr 2011
Decision: CONDITIONAL
11 Apr 2011
Grant issued
18 May 2011
Application Details
- Location
- Ballyellis Td. Mallow Co Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 15 February 2011Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 11 April 2011
- Grant Date
- 18 May 2011
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Renovations and extension to dwellinghouse
BALLYELLIS, BALLYELLIS,
Retention of (a) alterations to all four facades of existing dwelling and (b) detached domestic garage
Ballyellis Mallow
Dwelling
Ballygarrett Mallow
Construction of a dwelling house and all associated site works.
Ballyellis Mallow Co. Cork
Construction of a dwelling and all associated site works.
Ballyellis Mallow Co Cork
Dwellinghouse
Ballyellis Mallow
Installation of a wastewater treatment plant and percolation area
Ballyellis Mallow Co Cork
Installation of a wastewater treatment plant and percolation area
Ballyellis Mallow Co Cork
permission for change of 9 no. houses consisting of 3 no. 4 bed house types "E", 4 no. 4 bed house types "D" and 2 no. 5 bed house types "L" previously permitted under Phase 3 plan file 55,035/06, to 8 no. houses consisting of 2 no. 4 bed new house type "E", 4 no. 4 bed new house type "D" and 2 no. 3 bed new house type "H1" and associated site works
Castlepark Residential Development St. Josephs Road Mallow Co. Cork.
The proposed development includes for the upgrade of the existing Mallow WTP to bring it into compliance with Uisce Éireann technical guidance documents with regards the coagulation, flocculation & clarification (CFC), filtration, chemical storage & dosing and residuals treatment processes. In addition, as part of the upgrade works it is proposed to increase the capacity of the WTP from 4,754m3/day to 5,042m3/ 22 hours. The development will consist/consists of the following: • Upgrade of the existing CFC process, including for the following: o Construction of a new flash mixing chamber with vertical turbine paddle; o Construction of a 3 no. cell flocculation stage and mixing process (Note: The provision of the new flash mixing and flocculation tank will require the relocation of existing outdoor chemical bulk storage tanks, the demolition of an existing storage building adjacent the main WTP building and the relocation of existing overhead lines.) • Pipework modifications to the existing rapid gravity filters. • Upgrade of the existing washwater residuals and sludge handling processes to ensure adequate treatment of residuals prior to river discharge and adequate storage for sludge on site, including: o 1no. new below ground equalization tank o 1no. new above ground settlement tank to be installed. o Re-purpose the existing sludge holding tank as a sludge balance tank. o 1no. picket fence thickener. o 1no. new sludge holding tank. o 2 no. pumping station kiosks, including: -sludge pumping station -sludge holding tank feed pumping station • Upgrade of the existing chemical storage arrangements including: o Installation of 1 no. outdoor Fluoride Bulk storage tank with integrated weather shrouded bund o Installation of 2 no. outdoor Poly Aluminium Chloride bulk storage tanks with integrated weather shrouded bunds o Installation of 2 no. outdoor Sodium Hydroxide bulk storage tanks with integrated weather shrouded bunds o Installation of 1no. outdoor Sodium Hypochlorite bulk storage tank. o Installation of 2 no. dedicated chemical delivery apron upon which chemical delivery vehicles shall park while unloading chemicals to the bulk storage tanks. The surface water network for the chemical delivery apron shall be able to be isolated during chemical deliveries and redirected towards a dedicated underground containment tank to capture any chemical spills. o Installation of 1no. indoor Orthophosphate bulk storage tank and bund. (Note, the existing chemical building to be modified including for replacement of 2 no. windows with a single and double door respectively). • Upgrade of the road layout to facilitate the proposed infrastructure upgrade for delivery of chemicals and sludge removal off-site. • Upgrade the surface water management for the proposed works, ensuring that the design complies with the requirements for sustainable drainage system (SuDS). • All ancillary site works including upgrade of the existing electrical, instrumentation, control & automation of the plant, diversion of existing overhead power lines and tree and hedgerow removal.
Mallow Water Treatment Plant, Ballyellis, Mallow, Co. Cork, P51 P489
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?