← Back to search

16 College Avenue Carrignafoy Cobh

INCOMPLETED APPLICATION

Planning application 11/4775

Cork - Cork County Council

Proposed Development

Construction of extension to side of dwelling with roof lights to attic storage area and single storey sunrrom/utility to rear

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    14 Apr 2011

  2. Decision due

    8 Jun 2011

Application Details

Location
16 College Avenue Carrignafoy Cobh
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
14 April 2011
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
8 June 2011

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
11/4872CONDITIONAL26 Apr 2011

Extension to side of dwelling with roof lights to attic storage area and single storey sunroom/utility to rear

No. 16 College Avenue Carrignafoy Cobh

42m
07/10601CONDITIONAL29 Aug 2007

Construction of first and second floor extensions over existing single storey annex and construction of single storey rear extension to dwellinghouse

No.20, The Spires Carrignafoy Cobh

42m
19/4635CONDITIONAL14 Mar 2019

Construct a single storey porch extension (3.45sq.m) to the front [east] elevation of the existing dwellinghouse. The existing lean-to roof over bay window outshot will join into roof over proposed porch.

20 The Spires Carrignafoy Cobh Co. Cork

46m
06/6599INCOMPLETED APPLICATION24 Apr 2006

Extension to dwellinghouse

14 The Spires Carrignafoy Cobh

46m
06/7653CONDITIONAL30 May 2006

Attic conversion and installation of dormer window and rooflights to dwellinghouse

No.14, The Spires Carrignafoy Cobh

53m
17/4834CONDITIONAL7 Apr 2017

1) Construction of a new single storey extension to the rear of dwellinghouse, 2) Re-positioning two first floor windows at the rear of dwellinghouse, 3) Converting the attic space of dwelling house to habitable space including installation of two dormer windows and one roof window, 4) Installation of new ground floor window to side of dwellinghouse and all associated site works.

21 The Spires Carrignafoy Cobh Co. Cork

64m
19/6541CONDITIONAL23 Oct 2019

A) (i) Construction of a two-storey extension to the side (east) of existing dwellinghouse and associated site works, (ii) insert a velux rooflight to front roof of existing dwellinghouse. B) Retention of the existing single-storey sunroom extension located at the rear of dwellinghouse.

22 College Drive College Manor Carrignafoy Cobh, Co. Cork

78m
08/4189INCOMPLETED APPLICATION17 Jan 2008

Construction of two storey extension to dwellinghouse

No.18, The Drive College Manor Carrignafoy Cobh

78m
08/4679REFUSED11 Feb 2008

Construction of two storey extension to dwellinghouse

No.18, The Drive College Manor Carrignafoy Cobh

82m
15/6875CONDITIONAL17 Dec 2015

(a) Construction of a single storey kitchen extension and installation of 2 no. rooflights to the ground floor dining room at the rear (north) of dwelling house together with a new external side door to the ground floor utility room, (b) construction of a first floor extension to the side (east) incorporating part use of the attic space as a walk-in wardrobe with a rooflight to the front (south), (c) conversion of existing attic space to provide bedroom and en-suite accommodation with a dormer window and rooflight to both the front and rear, together with all associated alterations and site works

18 The Spires Carrignafoy Cobh Co. Cork

The submission window has closed

Observations on this application closed on Wednesday 18 May 2011, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?