Proposed Development
Completion of extensions to 3 no. previously permitted buildings and on site ancillary works to include manufacturing building extension to consist of 3 no. storeys comprising of process manufacturing areas and a mechanical plant room, warehouse extension to consist of a single storey garment change and cold storage areas, central utilities plant building extension consisting of double height utilities room, on site ancillary facilities to include 1 no. emergency generator, diesel storage tank, associated pumps and pipe rack, site access/circulation roads, 56 no. additional car parking spaces, landscaping, earth mounds and all other site development works above and below ground permitted under Planning Reg. No. 06/7499
Application Timeline
Application received
27 Apr 2011
Decision: UNCONDITIONAL
31 May 2011
Decision due
21 Jun 2011
Application Details
- Location
- Barnahely Ringaskiddy
- Applicant
- N/A
- Application Type
- EXTENSION OF DURATION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 27 April 2011
- Status
- APPLICATION FINALISED
- Decision
- UNCONDITIONAL
- Decision Date
- 31 May 2011
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of boiler room, container storage space, piperack and palisade fencing for a Biomass (wood chip) boiler
Barnahely Ringaskiddy
Construction of extensions to 3 no. previously permitted buildings and on site ancillary works to include manufacturing building extension to consist of 3 no. storeys comprising of process manufacturing areas and a mechanical plant room, warehouse extension to consist of single storey garment change and cold storage areas, central utilities plant building extension consisting of double height utilities room, on-site ancillary facilities to include 1 no. emergency generator, diesel storage tank, associated pumps and pipe rack, site access/circulation roads, 56 no. additional car parking spaces, landscaping, earth mounds and all other site development works above and below ground.
Ballybricken Ringaskiddy
Extension to existing car park by 96no. spaces comprising of new dense bitumen macadam surface, additional footpaths, smoking shelter, lighting, drainage and all associated site works
Barnahely Ballybricken Ringaskiddy Co.Cork
The proposed development will consist of: 1. Temporary permission for 5-years for the continuation of use of 2 No. existing single storey modular construction Office Buildings (Buildings No’s. 8 and 9) comprising a floor area of c. 48.5 sqm each (c. 97.0 sqm total floor area), and each with max. height of c. 2.7 meters, at south-eastern part of the campus. 2.Temporary permission for 5-years for the continuation of use of 2. No. existing single storey modular construction office/workshop Buildings (Buildings No’s. 13 and 14) comprising a floor area of c. 45.0 sqm each (c. 90.0 sqm total floor area) and each with max. height of c. 2.7 meters, at northern part of the campus. 3. Permanent Permission for the modular production support building (former Gowning Room) granted temporary permission under Reg. Refs. 21/5786 & 24/5501 for continued production support activity with building max. height of c. 3.76m, to include an increase of floor space by c. 7.0 sqm to provide a gross floor area total of c. 283 sqm, ancillary plant for air conditioning and air handling units, and a minor adjustment of the building’s position relating the connection corridor to Production Building P02. This application relates to development, which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P0778-03).
Johnson & Johnson Innovative Medicine, Barnahely, Ringaskiddy, Co. Cork, P43 FA46
Construction of boiler room and container storage space for Biomass (wood chip) Boiler as part of carbon dioxide emission reduction programme
Barnahely Ringaskiddy
Modular buildings and structures comprising as follows: 1) Permanent retention of an existing 884sq.m temporary equipment store building and extension of the building by a further c.414 sqm, 2) Construction of a new single storey c.110 sq.m amenity building and a new single storey c.60 sq.m workshop building, both located at the site waste water treatment plant area, 3) Temporary continuation for a further 5 years of use of the existing 4 no. single storey, 360 sq.m pre-fabricated temporary modular office units permitted under planning references 16/07150 and 22/4608, 4) Temporary continuation for a further 5 years of use of existing 276 sq.m modular gowning and locker building permitted under planning reference 21/5786. This application relates to development which comprises activity which holds an Industrial Emissions Directive Licence (Reg. No. P0778-02).
Barnahely Ringaskiddy Co Cork
Permission for 1) construction of a 2 no. storey extension to the west elevation of production building P01 comprising gross floor area of approximately 294sq.m with maximum height of 19.2m (to parapet) to facilitate installation of new equipment (parts washers and autoclaves) to replace end-of-life equipment. 2) all associated site development works including adjustment to adjacent hard-standing and kerbing, repositioning of the existing Liquid Nitrogen Enclosure, provision of drainage and site service connections and associated site works. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P0778-02)
Barnahely Ringaskiddy Co.Cork
Permission for (i) Construction of a 2 no. storey extension to the west elevation of production building P01 comprising gross floor area of approximately 294sq.m with maximum height of 19.2m (to parapet) to facilitate installation of new equipment (parts washers and autoclaves) to replace end-of-life equipment. (ii) All associated site development works including adjustment to adjacent hard-standing and kerbing, repositioning of the existing Liquid Nitrogen Enclosure, provision of drainage and site service connections and associated site works. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P0778-02)
Barnahely Ringaskiddy Co.Cork
Extension to existing car park comprising of an additional 70 car parking spaces, new tarmacadam surface, additional footpaths, lighting, drainage and all associated site works
Barnahely Ballybricken Ringaskiddy
(i) 1 no. 3-storey office extension to the existing administration building with a floor area of approximately 2,721 square meters, an overall parapet height of 16.3 meters and connected by overhead passageway to the southern elevation of the administration building; (ii) temporary continuation for a further 2 years of use of the existing 4 no. single-storey, 360 square meter pre-fabricated temporary modular office units permitted under planning reference 16/07150; (iii) permanent continuation of use for the existing 95 no. car spaces temporarily permitted under reference 16/07150. The development will include associated works for local site roads, footpaths, connection to underground services, landscaping and site works. The proposed development is located on lands approximately 1.32 hectares within the existing permitted manufacturing campus. This application relates to development which comprises an activity which holds an industrial emissions directive licence (Reg. No. P0778-02)
Barnahely Ringaskiddy Co.Cork