Proposed Development
(a) Construction of 1 no. shed to include cubicle livestock housing, feed passage and, underground slatted slurry flow channels. and (b) Construction of 1 no. unroofed slurry tank along with associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
12 May 2011
Decision: CONDITIONAL
26 Sept 2011
Decision due
3 Oct 2011
Grant issued
1 Nov 2011
Application Details
- Location
- Kilmore Bandon Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 12 May 2011
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 26 September 2011
- Grant Date
- 1 November 2011
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
A. Construction of 1 no. shed to include cubicle livestock housing, feed passage and underground slatted slurry flow channels; B. Construction of 1 No. unroofed slurry tank -Extension of Duration of Permission granted under Planning Reg. No. 11/5010
Kilmore Bandon Co. Cork
Dwelling house, garage & septic tank
Kilmore Bandon
Dwellinghouse
Kilmore Ballinacurra Bandon
The development will consist of: 1. An extension to the existing sand & gravel pit with extraction area of c. 9.8 hectares worked on a phased basis. 2. Continued use of development granted planning permission under P. Ref. 24/6269 comprising the existing processing plant and related water management system; the existing concrete plant; ancillary buildings (site office (63 sq.m), 3 no. welfare portacabins (32 sq.m, 23.5 sq.m & 22.0 sqm), 4 no. storage buildings / containers (15 sq.m, 10 sq.m, 6 sq.m & 5 sq.m), 2 no. garages (76 sqm & 76 sq.m), ESB Substation (26 sq.m)); covered vehicle storage (220 sq.m); site access and all related ancillary facilities (wheelwash, fuel storage tank, weighbridge); and recycling of c. 15,000 tonnes of concrete per year for use in concrete production. 3. Phased and final restoration to agricultural use. All within an application area of c. 18.3 hectares. Permission is sought for fifteen years plus two years for final restoration (total duration 17 years). An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the application.
Kilmore, Brinny, Co. Cork
The importation of soil & stone for the raising of an agricultural field/restoration of a quarry in order to improve the agricultural output of the field/quarry.
Kilmore Bandon Co. Cork
Alterations and extension to dwelling and retention of existing extension to dwelling
KILMORE, KILMORE,
Dwellinghouse
Kilmore Bandon
The proposed development will comprise an extension (extraction area c. 10.8 hectares) of existing sand & gravel pit (planning ref. S/02/1023); continuance of use of processing plant and related water management system; continuance of use of the existing concrete plant and ancillary buildings; continuance of use of the existing access; importation of c. 180,000 tonnes of inert soil and stone fore site restoration; recycling of c. 15,000 tonnes of concrete for use in concrete production; phased restoration of the overall site to agricultural use; and all related ancillary works/facilities within an application area of c. 35.7 hectares. Permission is sought for eight years plus two years final restoration (total duration of ten years). The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR).
Kilmore Brinny Co.Cork
The proposed development will comprise an extension (extraction area c. 10.8 hectares) of the existing sand & gravel pit (Pl.Ref.No. S/02/1023); completion of extraction within the existing sand & gravel pit; continuance of use of the existing processing plant and related water management system; continuance of use of the existing concrete plant and ancillary buildings; continuance of use of existing access; importation of c. 180,000 tonnes of inert soil and stone for site restoration; recycling of c. 15,000 tonnes of concrete for use in concrete production; phased restoration of the overall site to agricultural use; and all related ancillary works/facilities within an application area of c. 35.7 hectares. Permission is sought for eight years plus two years for final restoration (total duration of ten years). The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR).
Kilmore Brinny Co Cork
The proposed development will comprise an extension (extraction area c. 10.8 hectares) of the existing sand & gravel pit (planning ref. S/02/1023); completion of extraction within the existing sand & gravel pit; continuance of use of the existing processing plant and related water management system; continuance of use of the existing concrete plant and ancillary buildings; continuance of use of the existing access; importation of c. 180,000 tonnes of inert soil and stone for site restoration; recycling of c. 15,000 tonnes of concrete for use in concrete production; phased restoration of the overall site to agricultural use; and all related ancillary works / facilities within an application area of c. 35.7 hectares. Permission is sought for eight years plus two years for final restoration (total duration of ten years). The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR).
Kilmore Brinny Co. Cork