Proposed Development
Community allotment scheme, erection of 2m high fence around the entire development, portacabin for tool storage, well and housing, water storage tank, wind turbine, (total height to blade tips 9.6m), new vehicular entrance from Newtown Road, new roadway to compund and hardstanding for carparking
Application Timeline
Application received
23 May 2011
Decision due
18 Jul 2011
Application Details
- Location
- Ballynoe Cobh Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 23 May 2011
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 18 July 2011
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
construction of a community allotment scheme, with a 2m high fence around the entire development, portacabin for tool storage, well and housing, water storage tank, wind turbine, (total height to blade tips 9.6m), new vehicular entrance from newtown road, new roadway to compound and hardstanding for car parking
Ballynoe Cobh Co. Cork
A 2 metre high fence around entire development, portacabin, well and housing, water storage tank, wind generator, new vehicular entrance, roadway and hardstanding
Ballynoe Cobh
Permission for modifications to existing dwelling house, namely; 1) construction of a two-storey extension to the rear of the existing dwelling, 2) construction of a single storey porch extension to the front of the existing dwelling, 3) insert 1no. bathroom window opening at first floor level on the side of the existing dwelling house, 4) insert 1 no. utility window opening at ground floor level on the side of the existing dwelling and 5) all associated site works
6, Chestnut Mews, Cluain Ard, Ringmeen, Cobh, Co. Cork, P24D928
Construction of 14 no. three bed semi-detached dwellings in lieu of 7 no. four bed detached dwellings (No's 7 & 12 Chestnut Mews, No.7 & 12 Chestnut Close and No's 11, 34 & 38 Cherry Orchard, change in layout and increase in density) part of residential development permitted under 04/6297
Cluain Ard Newtown Ringmeen Rural Cobh
Construction of 14 no. semi-detached dwellinghouses in lieu of 7 no. permitted(04/6297) detached dwellinghouses at No's 7 & 12 Chestnut Mews, No's 7 & 12 Chestnut Close and No's 11, 34 & 38 Cherry Orchard
Cluain Ard Newtown Ringmeen Cobh
Dwellinghouse
Site No. 6 Ashgrove, Newtown Ringmeen Cobh
Residential development to include 202 no. dwellinghouses, 24 no. apartments, 21 no. serviced sites for dwellings and associated site development works
Newtown Ringmeen Cobh
Dwellinghouse
Site No.6 Ashgrove Newtown Cobh
Revisions to 86 no. dwellinghouses permitted under pl. reg. no.04/6297 to include replacement of 30 no. type C dwellings and 2 no. type F1 dwellings with 32 no type C3 dwellings, replacement of 54 no. type F2 type dwellings (91.6sq.m) with 54 no. type F2 type dwellings (100.2sq.m), repositioning of units to accommodate new house plans and associated revisions to site development and landscaping works to No's 2-3, Hazel Walk, No's 20-27 Chestnut Drive, No's 2-9 and 12-17 Beechwood Grove, No's 1-20 Maple Close, no's 1-10, 12-17, 21-24, 28-33, 35-37, 39-45 and 49-54 Cherry Orchard
Cluain Ard Newtown Ringmeen Cobh
New vehicular entrance to include: Dropped kerbs and dished concrete footpath to grassed area, and modification of existing concrete footpath to the front entrance to house.
34 Beechwood Court Cluain Ard Cobh Co. Cork
The submission window has closed
Observations on this application closed on Sunday 26 June 2011, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?