Proposed Development
Raising of levels to improve the lands for agriculture by the importation of construction and demolition wastes, Bitumen material for the construction of access road and turning area and all associated site works
Application Timeline
Application received
16 Feb 2011
Decision: CONDITIONAL
13 Oct 2011
Decision due
17 Oct 2011
Grant issued
18 Nov 2011
Application Details
- Location
- Benduff Rosscarbery Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 16 February 2011Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 13 October 2011
- Grant Date
- 18 November 2011
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Development will consist of raising ground levels with imported inert soil and stone to improve the agricultural output of the lands, a 10 year permission is being sought.
Benduff, Rosscarbery, Co. Cork
The development will consist of raising ground levels with imported inert soil and stone to improve the agricultural output of the lands. It is proposed to import and recover inert soil and stone under a waste facility permit, and as a by-product under article 27 of the European Communities (Waste Directive) Regulations 2011 (S.I. No 126 of 2011) to the amount of 94,980 tonne. It will include installation of a wheel wash and all ancillary site works. A 10-year planning permission is sought.
Benduff, Rosscarbery, Co Cork
The development will consist of raising ground levels with imported inert soil and stone to improve the agricultural output of the lands. It is proposed to import and recover inert soil and stone under a waste facility permit, and as a by-product under article 27 of the European Communities (Waste Directive) Regulations 2011 (S.I. No 126 of 2011) to the amount of 94,980 tonne. It will include installation of a wheel wash and all ancillary site works. A 10-year planning permission is sought.
Benduff, Rosscarbery, Co Cork
The development will consist of raising ground levels with imported inert soil and stone to improve the agricultural output of the lands. It is proposed to import and recover inert soil and stone under a waste facility permit, and as a by-product under article 27 of the European Communities (Waste Directive) Regulations 2011 (S.I. No 126 of 2011) to the amount of 94,980 tonne. It will include installation of a wheel wash and all ancillary site works. A 10-year planning permission is sought.
Benduff, Rosscarbery, Co Cork
Dwelling & domestic garage
BENDUFF, BENDUFF,
Dwelling and install waste water treatment system
Benduff Rosscarbery
Dwelling and install waste water treatment system
Benduff Rosscarbery Co. Cork
Demolition of farm building & construction of two storey extension to dwellinghouse
CASHEL VALLEY FARM, CASHEL,
Erection of additional 0.6 m link dish and retention of 18 m high telecommunications structure with 6 no. panel antennae and 3 no. 0.6 link dishes, ancillary equipment container, security fencing and access track
Benduff Rosscarbery
Erection of 0.6 link dish and the retention of an 18 m high telecommunications structure with 6 no. panel antennae and 3 no. 0.6 link dishes, ancillary equipment container, security fencing and access track
Benduff Rosscarbery