ESB Kanturk 38kV Electrical Transformer Station Dromalour Kanturk
CONDITIONALPlanning application 12/4440
Cork - Cork County Council
Proposed Development
Alterations to existing station to include: replacement of existing 1.2 metre high chainlink fence and gates with new 2.6 metre high palisade fence and gates, screen planting to the front of the station and associated site works
Application Timeline
Application received
9 Mar 2012
Decision: CONDITIONAL
26 Apr 2012
Decision due
3 May 2012
Grant issued
1 Jun 2012
Application Details
- Location
- ESB Kanturk 38kV Electrical Transformer Station Dromalour Kanturk
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 9 March 2012Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 26 April 2012
- Grant Date
- 1 June 2012
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of a dwelling, domestic garage and all associated site works.
Dromalour Kanturk Co. Cork
Dwellinghouse
Dromalour Kanturk
Dwellinghouse and proprietary treatment unit
Dromalour Kanturk
Two storey domestic garage
Dromalour Kanturk
Two storey domestic garage
Dromalour Kanturk
Alterations and extensions to dwellinghouse
Dromalour Kanturk
Dwellinghouse and garage
Dromalour Kanturk
Construction of slatted dairy unit and soiled water tank
Dromalour Kanturk
Alterations, extensions, ancillary site works & the partial sub-division of existing single storey warehouse (previous planning no. 06/4050), from 3no. units to 2no. units with ancillary canteen & office facilities & erection of a bunded oil storage tank to the rear of the premises. Alterations & elevational changes to include: (a) Unit 1 to be used as a food distribution centre, with the introduction of a dock-leveller to western end of the building, a canopy & van loading platform to the front of the building to include 5no. roller shutter dooors, (b) Unit no.2 , the removal of existing roller shutter door to be replaced with 2no. windows & new pedestrian dooor to replace existing window
Dromalour Kanturk
(1) Construction of a steel cladded industrial storage building which will include a single loading dock, (2) construction of a revised vehicular entrance to suit articulated vehicles, (3) construction of a concrete wall with palisade railing around site perimeter, (4) construction of concrete pavements around new building and (5) all associated site works.
Site 6 & 7 Dromalour Industrial Estate Dromalour Kanturk, Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?