← Back to search

Tullagreen Carrigtwohill Co. Cork

INCOMPLETED APPLICATION

Planning application 12/4966

Cork - Cork County Council

Proposed Development

Construction of a switch room building and transformer enclosure and associated

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    9 May 2012

  2. Decision due

    3 Jul 2012

Application Details

Location
Tullagreen Carrigtwohill Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
9 May 2012
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
3 July 2012

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
12/5042CONDITIONAL18 May 2012

Construction of a switch room building and transformer enclosure and associated works

Tullagreen Carrigtwohill

34m
25/4007CONDITIONAL8 Jan 2025

Permission for alterations and revisions to the previously approved planning reference number 22/4839. The proposed changes include a reduction in the size of the T7 building and an expansion of the pump house footprint (total 5.6m2 increase in total floor area). Modifications to the permanent bridge are also proposed, involving adjustments to its external materials and dimensions. Site-wide landscaping updates are planned, along with the installation of high-level signage on the IC4 production building. Minor adjustments to the type, size and placement of doors and windows are proposed for the IC4 production building, central utility building, drum store and foam deluge building. The application also includes the relocation of the southeast gate and detailing of the cycle route. Finally, alterations to plant, machinery, and tanks to the IC4 production building, yard area and fire water tank areas are part of this proposal. The proposed development is located on an existing manufacturing site which the Major Accidents Directive applies. The site is also subject to both an Industrial Emissions License and an Integrated Pollution Control License, regulated by the environmental Protection Agency (EPA). A Natura Impact Statement and Appropriate Assessment Screening Report is submitted to the Planning Authority with this Application.

Tullagreen and Carrigtohill Carrigtwohill Co.Cork

51m
15/4797CONDITIONAL20 Apr 2015

Construction of an extension to the existing manufacturing building, demolition of existing personnel entrance porch, and associated site works. The extension will comprise a single storey double height space with mezzanine. Permisison is also sought for the construction of 30 additional car-parking spaces and the re-location of 15 car-parking spaces. The application relates to an establishment which holds an integrated pollution prevention and control (IPPC) licence and to which the Major Accident Regulations apply

Tullagreen Carrigtwohill

56m
19/7005CONDITIONAL18 Dec 2019

The construction of a two-storey plantroom extension to an existing production building and retention of existing single storey airlock access to existing production and associated site works at the existing facility. The proposed development is for modifications to an establishment to which the Major Accidents Directive applies. The establishment holds an Industrial Emissions License and is regulated by the Environmental Protection Agency. Under the proposed development the site will remain in compliance with all regulatory requirements under existing license condition.

Tullagreen Carrigtohill Co. Cork

63m
12/4109INCOMPLETED APPLICATION27 Jan 2012

Construction of an expansion to the existing waste water treatment plant to include a Laboratory/Control building, an extension to the existing sludge dewatering building, an aeration tank, waste storage tanks, roads, piperacks, bunds, plinths, fencing, earthworks and associated works

Tullagreen Carrigtohill Co. Cork

63m
04/9125CONDITIONAL13 Dec 2004

Construction of first floor mezzanine within existing industrial unit, in order to expand a medical device assembly area

Tullagreen Carrigtwohill

63m
06/4900CONDITIONAL17 Feb 2006

Construction of a two storey manufacturing building, a single storey mix room extension (7.8m high) to the Hi-flow building, a thermal oxidiser, stack (14.6m high)and its associated base, cooling tower and plinth (5m high), solvent recovery unit (15m) and plinth, Drum store, an additional 100 no. carpark spaces, an extension to the existing piperack, associated site works and ancillary landscaping, the relocation of the proposed extension to existing tank farm and tank farm electrical room (MCC) previously granted under P.A. ref: S/01/5172 (change of plan), the construction of a two storey maintenance workshop as granted under P.A. ref: S/01/5172, also the retention of a small single storey water services room as an extension to the West of the Hi-flow building

Tullagreen Carrigtwohill

64m
12/6574CONDITIONAL18 Dec 2012

(1) Construction of a new two-storey extension with an area of 1695sqm for use as a membrane pilot research and development facility containing process rooms, research & development laboratories and plant areas. (2) Construction of a single storey extension of 100sqm to existing drum store, (3) Relocation of existing nitrogen tank, fire water tank and fire water pump house with an area of 31sqm (4) Relocation of existing cooling tower with concrete platform (5) Provision of 30 additional car parking spaces, and (6) Partial demolition of existing stone wall including all associated site works,

Tullagreen Carrigtwohill Co.Cork

64m
13/5948CONDITIONAL10 Oct 2013

Construction of a new two-storey extension with a proposed total floor area of 1995sqm for use as a membrane pilot research & development facility containing process rooms, laboratories, associated ancillary support areas and the provision of a roof mounted plant. (2) Retention of a new single storey fire water sprinkler pump house with a total floor area of 25sqm, (3) all associated site works

Tullagreen Carrigtwohill Co.Cork

65m
13/4033CONDITIONAL11 Jan 2013

Retention of an extension to the casting hall, utility boiler area and toilet block, administration waste area and balcony, waste water treatment de-sludging building, east side stairwell, south side stairwell, mixing room extension, drum store building location, roll store no. 1extension, roll store no. 2 extension, security building, facility cabin, lab offices, smoking shelter and associated works

Tullagreen Carrigtohill

The submission window has closed

Observations on this application closed on Tuesday 12 June 2012, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?